Light RFP
← All government bids
Federal · SAM.gov · Newport, RI

Construction - NUWCDIVNPT B68 Rm 136 Renovation Project

Due Jul 8, 2026·9 days left·Electrical, Roofing, Elevator, Windows / GlazingView official posting ↗
Issuing agency
Department of Defense
Method
Combined Synopsis/Solicitation
Category
Construction · NAICS 236220
PIN
N6660426Q0291
Location
Newport, RI
Posted
Jun 26, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED.

Amendment 0001 6/2/2026:

The purpose of this Amendment is to:

  • Replace Attachment #3 with revised version dated 18 May 2026.

  • Answer RFI 001 as seen below.

RFI 001

  1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable?

A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed.

  1. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured.

A2. No new glazing is required.

  1. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active.

A3. Leak is no longer active. No repairs to roof are required.

  1. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations?

A4. See Revised Specifications (REV 1).

  1. There is no spec for the glass for the windows. Will a spec section for the glass be made available?

A5. See Revised Specifications (REV 1).

  1. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project?

A6. Out-of-State is Allowed.

  1. Are electric man-lifts permitted for use on this project?

A7. Yes, however, it might be difficult getting a man lift in the area of work.

All other solicitation terms and conditions remain unchanged.


Please see N6660426Q0291 and all attachments for complete requirement details.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.

Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.

A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.

You must request access to the attachment by clicking on its title and providing the reason you need access.

You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.

Your entity is responsible for managing the documents in accordance with prescribed directives.

https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a

Please see Amendment 0002 attached. Additional Photos attached.

Please see Amendment 0003 attached.

Documents8
N6660426Q0291 Amendment 00003.pdfPDF
II.F. N6660426Q0291 Amendment 00002.pdfPDF
Davis Bacon WD 18 May 2026.pdfPDF
Attachment_7_SITE VISIT INSTRUCTIONS .pdfPDF
Attachment_6_Generator usage log.pdfPDF
Attachment_5_ Hazmat usage log.pdfPDF
Attachment_4_Davis Bacon WD 1_30_26.pdfPDF
N6660426Q0291 .pdfPDF

Contact

Name
Michael Ouellette
Address
Newport, RI 02841
Full source recordfrom SAM.gov
Type
Combined Synopsis/Solicitation
Title
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
Active
Yes
Base Type
Combined Synopsis/Solicitation
Notice Id
1e94b733e7f44cd3acde3d9652d41809
Naics Code
236220
Department
DEPARTMENT OF DEFENSE
Posted Date
Jun 26, 2026
Point Of Contact
Type
primary
Email
michael.n.ouellette.civ@us.navy.mil
Full Name
Michael Ouellette
Type
secondary
Email
alexander.olarte.civ@us.navy.mil
Phone
4018322648
Full Name
ALEXANDER OLARTE
Description Text
PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED. Amendment 0001 6/2/2026: The purpose of this Amendment is to: - Replace Attachment #3 with revised version dated 18 May 2026. - Answer RFI 001 as seen below. RFI 001 1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable? A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed. 2. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured. A2. No new glazing is required. 3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active. A3. Leak is no longer active. No repairs to roof are required. 4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations? A4. See Revised Specifications (REV 1). 5. There is no spec for the glass for the windows. Will a spec section for the glass be made available? A5. See Revised Specifications (REV 1). 6. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project? A6. Out-of-State is Allowed. 7. Are electric man-lifts permitted for use on this project? A7. Yes, however, it might be difficult getting a man lift in the area of work. All other solicitation terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Please see N6660426Q0291 and all attachments for complete requirement details. Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV. Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV. A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter. You must request access to the attachment by clicking on its title and providing the reason you need access. You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access. Your entity is responsible for managing the documents in accordance with prescribed directives. https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a Please see Amendment 0002 attached. Additional Photos attached. Please see Amendment 0003 attached.
Response Dead Line
Jul 8, 2026
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE NAVY.NAVSEA.NAVSEA WARFARE CENTER.NUWC DIV NEWPORT
Place Of Performance
Zip
02841
City
Code
49960
Name
Newport
State
Code
RI
Name
Rhode Island
Country
Code
USA
Name
UNITED STATES
Solicitation Number
N6660426Q0291

Source: SAM.gov (notice 1e94b733e7f44cd3acde3d9652d41809), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.