This is a combined synopsis/solicitation for commercial products prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
The U.S. Forest Service (USFS), Idaho Panhandle National Forests, has a requirement for the procurement and delivery of one (1) Utility Task Vehicle (UTV) and one (1) compatible all-season track kit. The equipment will be utilized by the Fire/Fuels program for wildland fire suppression and prescribed fire operations over severe, uneven terrain.
All equipment must be delivered new, fully assembled, fluids serviced, and in a 100% turnkey state ready for immediate field deployment upon arrival. Note: The UTV does not have to arrive with the track set physically installed on the vehicle. However, the vehicle must be fully prepped and the track kit must arrive brand new, complete, and ready to be installed by a certified dealer
To be considered responsive, contractors must submit combined pricing for both line items below:
CLIN 0001: Utility Task Vehicle (UTV)
Quantity: 1 EA
Delivery Location: IDAHO PANHANDLE NATIONAL FORESTS SUPERVISORS OFFICE
3232 WEST NURSERY ROAD
COEUR D'ALENE ID 83815
CLIN 0002: All-Season Track Kit
Quantity: 1 EA
Specifications: Must be 100% factory-compatible, field-interchangeable, and align directly with the vehicle awarded under CLIN 0001.
Salient Characteristics (Minimum Technical Specifications)
Proposed vehicles must meet or exceed the following design limits and features:
Engine & Cooling: 4-stroke, liquid-cooled engine.
Cylinder Displacement: Min: 998 cc | Max: 1500 cc.
Horsepower: Min: 80 hp | Max: 150 hp.
Dimensions: Length (120–138 in), Width (63–66 in), Height (76–82 in).
Ground Clearance: Min: 13 in | Max: 20 in.
Capacities: Person Capacity (2–3), Payload (1000–1700 lbs), Box Capacity (1000–1500 lbs), Towing Capacity (2500–3500 lbs).
Tires: 8 to 10 ply; Size Min: 27 x 9 x 14 | Max: 30 x 11 x 15.
Included Accessories/Features: Enclosed cab with full doors, hard top roof, glass full tip-out windshield with wipers, sliding window rear panel, heater/defroster, protection headache rack, front/rear a-arm protectors, skid plate, front/rear bumpers, fender flares, rock sliders, chainsaw mount, LED light bar, rearview mirror, and a >4,500 lb winch.
Track Specs: Rubber tracks with a steel frame designed for all-season flotation/traction. Minimum 2-year warranty on tracks; minimum 1-year warranty on the UTV.
Origin: Must be manufactured in the U.S.
Delivery & Shipping Terms
Delivery Timeline: All items must be physically delivered within 90 calendar days from the formal date of award.
Shipping: FOB Destination. Pricing must be fully inclusive of all freight, handling, and delivery charges. The contractor is responsible for offloading equipment at the specified facility. No loading dock or equipment available to unload.
UTV does not have to arrive with tracks installed but kit must be ready to be installed by a certified
Evaluation and Basis for Award
The Government will conduct a Side-by-Side Comparative Evaluation of quotes in accordance with simplified commercial procedures (FAR 12.201-1 and 12.205(c)(2)). Formal scoring matrices will not be used. A single Firm-Fixed-Price (FFP) contract will be awarded based on the following factors:
Technical Capability & Salient Characteristics: Degree to which the solution meets or exceeds design limits and accessory bundles.
Delivery Timeline: Preference/favorable evaluation may be given to shorter delivery timelines than the mandatory 90 days.
Price: Evaluated to ensure fairness and reasonableness.
Submission Requirements
Interested vendors must have an Active Registration in SAM (https://sam.gov) at the time of quote submission. Omitting a Unique Entity ID (UEI) will exclude the quotation package from consideration.
Quotation packages must be organized in the following order and submitted via email to mindy.hickman@usda.gov: Failure to provide these documents will result in your offer being exluded from concideration. Spec sheets must be provided to complete an evaluation.
SF-1449: Completed and signed (Blocks 17a, 30a, 30b, and 30c; including telephone, email, and SAM UEI in Block 17a).
SF-30 Amendments: Acknowledged and signed (if any are posted by the CO).
Schedule of Items: Completed pricing for CLIN 0001 and CLIN 0002.
Technical Documentation: Drawings, spec sheets, or product brochures verifying compliance with salient characteristics.
Closing Date for Receipt of Quotes: On or before 28 October 2026 no later than 11:00 AM PDT.
The contractor shall provide all required resources for the purchase, handling, shipping, and delivery of one turnkey UTV and one turnkey track kit in accordance with the product specifications detailed within Attachment 1. The UTV must meet or exceed specified design limits including a 4-stroke liquid-cooled engine, 998-1500 cc displacement, 80-150 hp, enclosed cab with full doors, hard top roof, glass full tip-out windshield with wipers, heater/defroster, and a >4,500 lb winch. The track kit must be rubber tracks with a steel frame designed for all-season flotation/traction, 100% factory-compatible and field-interchangeable with the awarded UTV. All equipment must be delivered new, fully assembled, fluids serviced, and in a 100% turnkey state ready for immediate field deployment. The UTV does not have to arrive with tracks installed, but the track kit must be brand new, complete, and ready to be installed by a certified dealer. Delivery is FOB Destination to the Idaho Panhandle National Forests Supervisors Office at 3232 West Nursery Road, Coeur d'Alene, ID 83815, within 90 calendar days from award.
We post new environment & conservation opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""972042829""Portland""OR""USA""1220 SW 3RD AVE STE 310""C04_CSS_1240BD27Q0006_UTV_Tracks.pdf"4298494"file"".pdf""1""2026-10-14T21:20:00.637+00:00""236a7d71a4904abe9976b379b296afa5""public""0""public""7a483abb15f54ee1b2600107d7984511""0"1"0"Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 168a35386f8c4240ae2e1345418c0101), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.