We post new hvac opportunities in South Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project is to provide and install two new forced air electric heaters in the first floor mechanical rooms to maintain temperatures at acceptable levels and prevent damage to building systems.
The contractor shall provide and install two wall mounted electric forced air heaters between 15kW and 20KW, each with a stand alone wall mounted adjustable thermostat, and install units per manufacturer recommendations for minimum clearances. The contractor shall also provide and install all required electrical components, conduit, and wire in accordance with NEC and core building standards. The contractor shall coordinate sequencing and control measures with the Project Manager and Property Manager, prevent public access to work areas, and protect the public at all times. The contractor shall replace and/or repair any damage caused as a result of this project to pre-construction conditions. Notice to proceed will only be issued after all material is in contractor's possession. The contractor shall field verify all requirements at time of pre-bid walk through.
"RFP 47PD5326R0044 Form 1442.pdf"601382"file"".pdf""1""2026-06-25T15:49:34.182+00:00""e02283d14e8a450b8104d3c814d2cad1""public""0""public""6e2a6397621a4e06bee6634c3353a2bd""0"5"0""FO SB Solicitation RFP 47PD5326R0044.pdf"252974"file"".pdf""1""2026-06-25T15:49:34.182+00:00""b67c1bae81a64cbea586473157e2edd6""public""0""public""23e7781974434c638ec06748f980effa""0"4"0""FO SB Agreement RFP 47PD5326R0044.pdf"250166"file"".pdf""1""2026-06-25T15:49:34.182+00:00""13319fdf9c234f76aae2a3becb7b87f7""public""0""public""0a4364f88cc84ac7858993dd4ac66426""0"3"0""GSA 527 Contractors Qualifications and Financial.pdf"1083953"file"".pdf""1""2026-06-25T15:49:34.182+00:00""530870a0b14c4b3dadf471e3b455cbed""public""0""public""d6b3ae6619f549b3b3d711793ad3837c""0"2"0""Vendor Fitness Determination Training Manual.pdf"7209495"file"".pdf""1""2026-06-25T15:49:34.182+00:00""fa15f796d69e44348daf9bd00ab6b2a7""public""0""public""2d446f6275464eae8597f53998a0a906""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 153dffb83aef4247980bb1c728ffad07), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.