This project is for the remodeling of the Gym/Fitness room at the U.S. Embassy Marine House, located in 1190 Vienna.
The old room structures and surfaces need improvement and renovation. The existing GYM will be expanded from 55m2 to 62m2, and the bathroom and a wall-cabinet will be demolished for this purpose.
Scope of work: General Contractor for Construction work and Electrical Installation
Demolition
Temporary plasterboard dust wall with door.
Demolition of partition walls (10cm), incl. wall coverings, 2 wooden doors+ doorframes and 1 wooden cabinet, electrical installation and equipment, incl. removal and disposal.
Demolition, removal and disposal of the existing wall- and floor tiles and in the bathroom, existing sanitary items and equipment in the bathroom, including pipes, and the
PVC flooring incl. glue.
Refurbishment
Walls and ceiling: plaster, level, clean, prime, paint to cover, incl. 16m2 floor covering material.
Floor: Clean, grind and level the floor; New PVC flooring in the demolition area.
Delivery and assembly of 6 new ceiling lights in new position, Including switch, wiring, and integration into the existing system.
Final cleaning
Special requirements
The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work
USG Security regulations
Clearance process for employees, cars, material on site
Safety and protective measures
Execution periods
Indicative construction schedule: 5 weeks in fall 2026
Source: SAM.gov (notice 11b6afe92d85411aa785df10483d7769), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.