**Amendment 0005: **This amendment provides responses to offeror questions concerning Work Items D-008 and D-021. The amendment corrects the drawing reference in D-008, Paragraph 3.2.3, to CG Drawing 418A-WMSL-801-1 and clarifies the Government-furnished equipment applicable to D-021. All other terms and conditions of the solicitation remain unchanged.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Amendment 0004: provides the Government’s responses to additional offeror questions regarding drawings and technical requirements associated with Work Items D-016, D-009, and D-008. The amendment also extends the solicitation closing date and time to October 5, 2026, at 1400 Pacific Time (PT); all other terms and conditions remain unchanged.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Amendment 0003: provides the Government’s response to an offeror question regarding the correct compartment identification for the MPAC work under Work Item D-018. The amendment clarifies that MPAC #1 is located in the FMMR Upper Level and that paragraph 1.1 identifies the correct work locations.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Amendment 0002**:** Adds a clarifying note regarding the Attachment 2 Specification posted in Amendment 0001 & extends the no later than due date for receipt of quotes from 22 September 2026 to 29 September 2026 at 10:00 am Pacific Time.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Amendment 0001: Replaces the Attachment 1 Price Schedule as well as the Attachment 2 Specification. The Attachment 2 Specification originally posted was for a previous/different project regarding the cutter. The Attachment 2 Specification which is part of Amendment 0001 is an entirely different specification and therefore specifies no revisions on the Revisions page iii.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Coast Guard Cutter MIDGETT fiscal quater 2, fiscal year 2027 dockside repair. The period of performance is 2 February - 8 May 2027.
The contractor must perform dockside repairs on the USCGC MIDGETT, including 25 work items such as cleaning and inspecting ballast, aviation fuel service, potable water, and MP fuel tanks; grooming the refrigeration plant; renewing the side boat davit; inspecting and grooming the oily water separator system; preserving potable water tanks; renewing ceramic tile deck covering; renewing piping and ducting insulation; installing dewatering overboard discharge connections; relocating the flight deck floodlight transformer; installing hydraulic system quick disconnects; installing MPAC demisters; installing weather deck scuppers; replacing fuel valves; modifying the dry provision storeroom; performing annual inspection and test of the cargo handling elevator; renewing wave guide dryer flexible hoses; renewing refrigeration plant flexible hoses; and inspecting and testing the fire detection system. The work also includes providing fire prevention, and the period of performance is 2 February - 8 May 2027.
We post new goods & materials opportunities in Hawaii as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""94501""ALAMEDA""CA""USA""COAST GUARD ISLAND, BLDG 50-7""MIDGETT_Solicitation_Amendment_A0005.docx"61516"file"".docx""1""2026-09-18T16:41:10.604+00:00""ad1e6112b9dd47f1822a73b3c1c5ff8f""public""0""public""7d77496de31444d4bc3b82b4eb9eb963""0"18"0""MIDGETT_Solicitation_Amendment_A0004.docx"61807"file"".docx""1""2026-09-17T19:18:51.189+00:00""2fed51cec0e44fef9230a3d9eef179d1""public""0""public""a8a6b0ea331f40e6b70dde5518536367""0"17"0""MIDGETT_Solicitation_Amendment_A0003.docx"59476"file"".docx""1""2026-09-11T16:25:49.424+00:00""1f8ae5b2fa7f480a82e7a9d1e8bf088b""public""0""public""ee7bd38c2f834a348afe04eb714e3c7c""0"16"0""Amendment 002 - MIDGETT DS Q2 FY27.doc"73728"file"".doc""1""2026-08-27T19:39:18.755+00:00""7cd14081c778497cb2a84bc360e48ee5""public""0""public""d7a6723a827049fdb12458a6b7734fec""0"15"0""Amendment 0001 - Attachment 2-Specification-updated-25Aug2026.pdf"2620410"file"".pdf""1""2026-08-26T21:24:36.499+00:00""89cd5d3823c149bba783574fb3e7730a""public""0""public""27eb10e1e750456a83b195deefcd5bf9""0"14"0""Amendment 0001 - Attachment 1-Price Schedule-Rev1-25Aug2026.xls"62976"file"".xls""1""2026-08-26T21:24:36.499+00:00""81f135490ebf4f6faf3f13895e12ea58""public""0""public""311ad8521d014969b0e15787f0f7742b""0"13"0""Amendment 0001.pdf"183442"file"".pdf""1""2026-08-26T18:26:14.382+00:00""6649a54c9cb543058d7c6a38bb23cd77""public""0""public""1bc20a3dc1a0446f9a4e0150b2bfa61f""0"10"0""Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA).pdf"622115"file"".pdf""1""2026-08-20T03:50:33.696+00:00""af8336e74311498490c7c9792d9c65dd""public""0""public""5b5a94b11c47441999aebc36744f03ec""0"8"0""Solicitation-MIDGETT_Q2FY27_70Z08526QLREP0024.docx"170618"file"".docx""1""2026-08-20T03:50:33.696+00:00""2431be30f47a4ddbaf3f577aa0f4c37c""public""0""public""e24f64fcf85347ebab0bc4c66e0fded1""0"7"0""Attachment 6 - Government Property Report.pdf"135498"file"".pdf""1""2026-08-20T03:50:33.696+00:00""e561d8e9f8d84a738575dfb5f149e2f0""public""0""public""c9d8b95d04984763bbc34279f10a8d84""0"6"0""Attachment 8 Change Request Proposal Form.xlsx"46288"file"".xlsx""1""2026-08-20T03:50:33.696+00:00""af521a5c766d47318491d1d18d1ccc9f""public""0""public""345c7f0925ca43869ba4cc49098f395d""0"4"0""Attachment 5 Questions.docx"31083"file"".docx""1""2026-08-20T03:50:33.696+00:00""2c5e79a07f3941979035bf929611b40c""public""0""public""7f62a59fc0964c29b2e7d026c82ef544""0"3"0""Attachment 3_Consolidated List of References.docx"31170"file"".docx""1""2026-08-20T03:50:33.696+00:00""a397f7dd765646fb9ca8d37a70d27dc1""public""0""public""7d04c562df9844d1b997a8e581616551""0"2"0""Attachment 4 Past Performance Questionnaire.docx"22936"file"".docx""1""2026-08-20T03:50:33.696+00:00""a79f63c9481744d58ecb322bd7323d51""public""0""public""c90b2b08f7c44fc5b03bd664179531b9""0"1"0"Most Hawaii work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0fe28f03b9dd435ebea16d6f5090dead), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.