Jennifer Brown (COW)
Install approximately 20 linear feet of 4-inch PVC solid sewer pipe with one underground two-way cleanout, a 1,500-gallon concrete two-compartment septic tank with effluent filter, and a 1,050-gallon concrete dosing tank with one dosing effluent pump, pump vault and controls. Install approximately 1,525 square feet of subsurface drip drainfield with auto-flush headworks, approximately 200 feet of 2-inch Schedule 40 PVC effluent supply and return line with traffic-rated sleeving, and 2-inch supply and return manifolds with vacuum relief valves per County-approved design. Pump and dispose of the existing septic tank offsite, perform vegetative clearing and grubbing, complete electrical work and County permits, and restore disturbed areas with grading, seeding and mulching.
We post new uncategorized opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""7-US DOL WD WA20260099 Dated 5-18-2026.pdf"41052"file"".pdf""1""2026-10-01T11:28:47.506+00:00""ac5d9b10186f4d3d835631a30cadbd88""public""0""public""b3788df5e8be445d87891cf7d80af9df""0"9"0""6-Measurement and Payment.pdf"125584"file"".pdf""1""2026-10-01T11:28:47.506+00:00""fb75de8debd2453da5d04e45234c012f""public""0""public""0bf5b82a9b6b4a82a080fe7d3e7a935e""0"8"0""5-Site Photos.pdf"1183544"file"".pdf""1""2026-10-01T11:28:47.506+00:00""d73dcbd8e218488290a4e06548c819d0""public""0""public""216537a968344e779db93d9bbd0ceccc""0"7"0""4-Aerial BrownJ.jpg"239158"file"".jpg""1""2026-10-01T11:28:47.506+00:00""a026d655696c4c2ba163f659541eed71""public""0""public""e6ecb42a2396419a9e7279e43e129998""0"6"0""3-Technical Specifications combined.pdf"277779"file"".pdf""1""2026-10-01T11:28:47.506+00:00""b3d0af46ebba4edcb05bcc536acf5433""public""0""public""9ec46884009449a199d01e0a537d1cd6""0"5"0""2-DESIGN 8May2026.pdf"6932086"file"".pdf""1""2026-10-01T11:28:47.506+00:00""0d179ef2c0264d9583b69a7b629f89f9""public""0""public""7c047da3167d482ebbc32c18fd1ce34d""0"4"0""1-Statement of Work.docx"34754"file"".docx""1""2026-10-01T11:28:47.506+00:00""4a4f57767b7b47598155e445d6b6cd67""public""0""public""39512441c0a34b84b448bc79328cdf26""0"3"0""B01 75H70126Q00036.pdf"826587"file"".pdf""1""2026-10-01T11:28:47.506+00:00""c29675b8cdf24850a4bdff35c39f0143""public""0""public""71cd79009a30406799e127f565b46bb8""0"2"0""A11 Pre-Solicitation SAM Notice.pdf"91079"file"".pdf""1""2026-10-01T11:28:47.506+00:00""b8dcd15118604115923a4b755abb4de1""public""0""public""eaa7cd8b424142609c14a648ca931690""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0f41d93830054c47b298b7d491b2321a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.