Light RFP
← All government bids
Federal · SAM.gov · Nationwide

North East River Maintenance Dredging, Cecil County, MD

Due Jun 30, 2026·0 days left·General ConstructionView official posting ↗
Issuing agency
Department of Defense
Method
Presolicitation
Category
Construction · NAICS 237990
PIN
W912DR26BA007
Location
Nationwide
Posted
Jun 15, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.

Contact

Name
Lauren Elamenuel
Phone
4109625137
Full source recordfrom SAM.gov
Type
Presolicitation
Title
North East River Maintenance Dredging, Cecil County, MD
Active
Yes
Base Type
Presolicitation
Notice Id
0dc1aa6bfb86429e98ab07aa6ce22322
Naics Code
237990
Department
DEPARTMENT OF DEFENSE
Posted Date
Jun 15, 2026
Point Of Contact
Type
primary
Email
lauren.n.elamenuel@usace.army.mil
Phone
4109625137
Full Name
Lauren Elamenuel
Description Text
The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.
Response Dead Line
Jun 30, 2026
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE ARMY.USACE.NAD.W2SD ENDIST BALTIMORE
Place Of Performance
Solicitation Number
W912DR26BA007

Source: SAM.gov (notice 0dc1aa6bfb86429e98ab07aa6ce22322), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.