Amendment 0002 issued to answer additional questions received.
The contractor shall remove and dispose of the existing interior lighting control system and fixtures, and furnish and install a new complete interior lighting control system and compatible LED exhibit-grade lighting fixtures. Flooring work includes furnishing and installing approximately 1,846 square feet of new wood flooring in the Town Room, Gift Shop, Theater, and Second Floor Gallery; repairing and refinishing approximately 710 square feet of existing wood flooring in the Entrance, Foyer, Second Floor Hallway, and stair landings; and repairing approximately 22 linear feet of carpet in the Lincoln Bedroom. The contractor shall also provide all programming, commissioning, testing, as-built documentation, and training.
We post new electrical opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""02129""BOSTON""MA""USA""CHARLESTOWN NAVY YARD, BLDG I-1""Sol_140P4226R0030_Amd_0002.pdf"338551"file"".pdf""1""2026-09-09T23:09:28.182+00:00""1beb0c43723249b0bd6eeeb75fcf6c01""public""0""public""596dc05a76824dcca53b3d475e23d11b""0"10"0""Attachment_7_-_140P4226R0030_Past_Performance_Questionnaire_0002.docx"48632"file"".docx""1""2026-09-09T23:09:28.182+00:00""adef2fa7be7a4f0080a8e0322ae84935""public""0""public""b2985f7f30164b039cd1c760f8d2c43a""0"9"0""Sol_140P4226R0030_Amd_0001.pdf"337426"file"".pdf""1""2026-09-04T15:54:01.733+00:00""3dd0f41091164d468c54cf8123b31f3e""public""0""public""b2c1c7a461354e73addaaa2ddd1afc6b""0"8"0""Sol_140P4226R0030.pdf"1057435"file"".pdf""1""2026-08-21T23:10:08.458+00:00""60d34ca08d70463db4d52e6774b93d8a""public""0""public""423d670c41f44e48998ef8a513fea121""0"7"0""Attachment_4_-__Technical_Capability_Submittals.docx"49299"file"".docx""1""2026-08-21T23:10:08.458+00:00""f965e99a44bf4c88bc1d3d09eb296f94""public""0""public""89192aa93b034b3c97374f461a83b3aa""0"6"0""Attachment_2_-_Drawings_2005_(For_Reference_ONLY).pdf"25557097"file"".pdf""1""2026-08-21T23:10:08.458+00:00""c957210ba0034f10a68adbcc78e82d34""public""0""public""fce389c4c23e4b38b9289c566671712e""0"5"0""Attachment_5_-_Certifications_From_Section_K.docx"91329"file"".docx""1""2026-08-21T23:10:08.458+00:00""fa022c6bbd0b490aa96d09c37efaa676""public""0""public""f0429ba7db0744868e16a0c771de7614""0"4"0""Attachment_1_-_SOW_DWH_Interior_Lighting_and_Flooring.docx"226806"file"".docx""1""2026-08-21T23:10:08.458+00:00""b72019bc412b409db7cbfafbeb889fcb""public""0""public""df9a86827f6c4fea959a185d51c76867""0"3"0""Attachment_3_-_Wage_Determination__PA20260073.pdf"205180"file"".pdf""1""2026-08-21T23:10:08.458+00:00""06464b6efdfc484abc74ef1fc26065c5""public""0""public""b91c790c2af348408a1780c9ad65190e""0"2"0""Attachment_6_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx"163538"file"".xlsx""1""2026-08-21T23:10:08.458+00:00""49e5079410e9440baa1e4a504bc8a47f""public""0""public""06db2738951b47d9b9e410209be6de4a""0"1"0"Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 0d5c02839b8740da8c9f7ce6650a7224), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.