DOCKSIDE: USCGC ALERT DS1 FY27
The Contractor shall furnish all necessary labor, materials, services, equipment, supplies, power, accessories, facilities, and such other things as necessary, except as otherwise specified to perform Dockside Repairs onboard the CGC ALERT in accordance with the Specification.
POP: 26 January 2027 - 22 March 2027
Contract Specialist: Petal Donald
Email: Petal.C.Donald@uscg.mil
The contractor shall furnish all necessary labor, materials, services, equipment, supplies, power, accessories, and facilities to perform dockside repairs on the CGC ALERT. Work items include renewing flexible couplings on main diesel engines and generators; cleaning, inspecting, and hydrostatically testing seawater heat exchangers; cleaning and flushing the chill water system; renewing ship's service boilers; cleaning and inspecting potable water pneumatic tanks, hot water accumulator tanks, grey water holding tanks, and sewage holding tanks; renewing sewage discharge and vacuum pumps; cleaning and flushing sewage piping; optionally preserving grey water and sewage holding tanks; providing temporary heating and cooling; renewing fire and smoke thermal detector sensors; replacing reduction gear lube oil strainer assemblies; renewing bridge windows; renewing chill water piping insulation; renewing steam system valves; renewing a sewage riser; optionally renewing a thrust bearing; repairing the starboard embarkation station; and inspecting and servicing the single point davit.
We post new goods & materials opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23510""NORFOLK""VA""USA""300 EAST MAIN ST, STE 950, VESS DIV""Combined Synopsis Solicitation - ALERT 70Z08026QMECP0035.pdf"302459"file"".pdf""1""2026-08-27T19:08:04.514+00:00""7db8dc3a4ffb4adbaed6773a6dcce60d""public""0""public""3920e2ca344a4ceab461a2b7995c9427""0"9"0""Attachment 1 Schedule of Services Blank Price Schedule.xls"52736"file"".xls""1""2026-08-27T19:08:04.514+00:00""d05de6d5100b45f6a2cc0b6713d75187""public""0""public""065434fa461f4645b3c03421c2015206""0"8"0""Attachment 2 Statement of Work Specification DS Repair.pdf"1163328"file"".pdf""1""2026-08-27T19:08:04.514+00:00""f91c770aede14a0d9c3fa69acfbed3dd""public""0""public""6e2c09cd6cb7402eb53c67d112dbd3a8""0"7"0""Attachment 3 STATEMENT OF WORK.pdf"138083"file"".pdf""1""2026-08-27T19:08:04.514+00:00""3a9aef834d4949c881b392eba2f37302""public""0""public""3bc3ca9f378b4d8db7dc163520e52d91""0"4"0"Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 03660f15d04745a0835961c201a10620), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.