See attachments.
The contractor shall remove all existing rubber flooring and adhesive glue, properly dispose of the material, prepare the concrete floor, and install new rubber flooring with a minimum thickness of 1/3 inch, black in color, slip resistant, and chemical resistant (specifically to petroleum products). The contractor shall ensure all seams are flush and properly connected with no gaps or buckling, groove all open seams, and apply seam welding treatment. At the end of each day and at project completion, the contractor will clean all job-related debris from the area.
We post new flooring opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"89191-7063""NELLIS AFB""NV""USA""ADMINISTRATIVE ONLY NO REQUISITIONS""5865 SWAAB BLVD""Rubber Flooring Site Visit Attendees 9-9-26.pdf"878838"file"".pdf""1""2026-09-09T18:05:49.326+00:00""5d8bde3069e44cebb2238a3c2b91ca87""public""0""public""3f74f0bed24b4f79b920dff6f97e02a0""0"5"0""F3G3AA6218AG03 Combo Amended 03 Sep 26.pdf"97254"file"".pdf""1""2026-09-03T20:56:12.281+00:00""316579a9afbd40f3831560caa9b3538f""public""0""public""864ee49841bf43d2beed026beba45203""0"4"0""Attachment 1 -SOW Rubber Flooring.pdf"363111"file"".pdf""1""2026-08-31T21:59:32.221+00:00""44cf15acc7684abe9036206ceb9ab7e8""public""0""public""0b8b08a2d5664dafaa8e30c7e32d9932""0"2"0""Attachment 2 - Wheel and Tire Shop Photos.pdf"5239798"file"".pdf""1""2026-08-31T21:59:32.221+00:00""12c350a62b2b48958bac217b969e101f""public""0""public""b4ca33d8b61546a0a321c2a1b0676748""0"1"0"Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice f71f94ab68284800874e6eccc4d711e8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.