Project Title: Fort Custer National Cemetery – Cemetery Expansion & Site Improvements
Project Number: 909CM3030
Procurement Method: Invitation for Bid (IFB) – Sealed Bidding
Agency: Department of Veterans Affairs (VA) National Cemetery (NCA)
Place of Performance: Fort Custer National Cemetery, 15501 Dickman Rd, Augusta, Michigan49012
The contemplated contract will include the following work as shown in the construction documents (Drawings & Specifications Volumes 1–3):
CLIN 0001 – Base Bid, General Construction (Cemetery Expansion):
Construct a 3,360-niche columbarium.
Develop gravesite sections for 3,712 pre-placed crypt burials.
Develop gravesite sections for 6,821 in-ground cremains interments.
CLIN 0002 – Option Bid Item 1 (Maintenance Yard Pavement):
Replace asphalt pavement with concrete in the maintenance yard per Bid Alternate in Volume
CLIN 0003 – Option Bid Item 2 (Site Improvements):
Renovations at the Administration Building and PIC/Restroom building.
Construct one new Storage Building in the maintenance area.
Provide swing space as depicted in the plans for Alternate “B”.
CLIN 0004 – Option Bid Item 3 (Irrigation Expansion):
Irrigation improvements at the existing cemetery.
Provide a permanent power source to Committal Shelter A.
Anticipated completion is 540 calendar days (18 months) from issuance of the Notice to Proceed.
Perform all work during normal business hours (Monday–Friday, 8:00 a.m. to 4:30 p.m., excluding Federal Holidays).
Establish construction limits, safety controls, and fencing; coordinate parking, laydown, and temporary facilities with the Cemetery Director.
Conduct site survey and utility locating; provide erosion/sediment control and maintain site drainage.
Execute site clearing, grading, landscaping (turf and seed), and final restoration; protect existing improvements and vegetation.
Provide daily progress summaries and at least 10 electronic photos documenting progress to the COR.
Submit required shop drawings, submittals, test reports, and as-built documents; furnish O&M manuals (as applicable).
Warranty materials and workmanship for at least one year from final acceptance. Obtain all necessary permits (including environmental) and dispose of waste off-site in accordance with law.
Requirements are specified in the IFB (anticipated standard construction bond requirements).
The official IFB, drawings, specifications, and any amendments will be posted exclusively on SAM.gov. Interested vendors must monitor SAM.gov for updates. Telephone requests will not be honored.
Prospective bidders must be registered and active in SAM (www.SAM.gov). If a socioeconomic set-aside (e.g., SDVOSB) is used, firms must hold required VA CVE verification at time of bid and award.
All pre-bid inquiries must be submitted in writing via the method provided in the IFB by the stated Q&A deadline. Do not contact the cemetery directly.
We post new general contractors opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""22134""QUANTICO""VA""USA""CENTRALIZED CONTRACTING DIVISION""5105 RUSSELL ROAD""S02_36C78626B0005_909CM303_GSE Fort Custer Final.pdf"171400026"file"".pdf""1""2026-08-19T17:45:13.103+00:00""879261ba64c64a0cbba87a9d4b6b85f5""public""0""public""f20075842e474e9cbf5049344ebfa97c""0"1"0"Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice f6819caa0d0f42879656f3ea88977cdf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.