The work to be performed consists of the removal of a non-essential low point drain from a three (3) inch condensate line and the replacement and addition of seismic bracing of the condensate line. Contractor shall furnish all tools, qualified labor, materials, equipment, supplies, and supervision necessary to replace and support repairs to the condensate line. All work shall be accomplished in accordance with all Federal, State, Local Regulations and the guidelines to include but not limited to the following:
1.International Building Code
2.International Mechanical Code
3.International Plumbing Code
4.American Welding Society (AWS)
5.National Electrical Code (NFPA 70)
6.National Fire Code (NFPA 1)
7.Base Architectural Compatibility Guide
8.Unified Federal Criteria (UFC)
9.Unified Facilities Guide Specifications (UFGS
The Government intends to award a single Firm-Fixed-Price (FFP) contract IAW the procedures at RFO 12.201-1 and RFO Part 36 respectively. A mandatory site visit will be held within an estimated three calendar days from the issuance of the solicitation. A draft Statement of Work (SOW) is attached for review. The anticipated date of award is no later than 30 September 2026. Please be advised this is not a request for quote.
We post new plumbing opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"29404-5021""JOINT BASE CHARLESTON""SC""USA""CP 843 963 5155""101 E HILL BLVD""DKGV 1161220 Repair Condensate Pipe Pier XRS DRAFT SOW.pdf"180467"file"".pdf""1""2026-08-20T14:43:53.23+00:00""fff65cc6ae384ebb8a903d060c534824""public""0""public""98a3c2cc85374106a7d6496d4227e6f7""0"19"0""DKGV 1161220 Repair Condensate Pipe Pier XRS Attachment 1 Special Conditions.pdf"119812"file"".pdf""1""2026-08-20T14:43:53.23+00:00""eceab2c642e24fb5bb340a21d899a5d0""public""0""public""c884d746cd5f491a85aff6221b256aba""0"18"0""DKGV 1161220 Repair Condensate Pipe Pier XRS Attachment 2 Pipe Drawing.pdf"331308"file"".pdf""1""2026-08-20T14:43:53.23+00:00""dc6a54432444427caac735dc0d9c85b3""public""0""public""89a4d5637f264ee98641cf782f2a4b4e""0"17"0""DKGV 1161220 Repair Condensate Pipe Pier XRS Attachment 3 Enviromental Compliance.pdf"108636"file"".pdf""1""2026-08-20T14:43:53.23+00:00""31a5d3c725e6497188e4303ef3bab950""public""0""public""5e49f21f44dd44b5b3895655de359efb""0"11"0""DKGV 1161220 Repair Condensate Pipe Pier XRS Site Photos 1 Lowpoint Drain.pdf"9674671"file"".pdf""1""2026-08-20T14:43:53.23+00:00""a8cb8bb65d6c4b208cf9057db86c9820""public""0""public""71f9ed4e7bb64594b3c591807541bd3c""0"6"0""DKGV 1161220 Repair Condensate Pipe Pier XRS Site Photos 2 Condensate Pipe.pdf"11132037"file"".pdf""1""2026-08-20T14:43:53.23+00:00""53a2be9b4ea24b02968f711051e378db""public""0""public""45d855b68ba24782a3bbb1af63e98699""0"5"0"Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice f3e657c09f0b4bff8deebc60abe51c01), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.