Light RFP
Federal · SAM.gov · Coatesville, PA

Fire Suppression Sprinklers at Coatesville VAMC

This opportunity closed on Jul 27, 2026. Browse current bids below.
Closed Jul 27, 2026·Plumbing, Fire ProtectionView official posting ↗
Issuing agency
Department of Veterans Affairs
Method
Combined Synopsis/Solicitation
Category
NAICS 811310
PIN
36C24426Q0415
Location
Coatesville, PA
Posted
Jul 22, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

Amendment 0005

  • Deleted requirements for CLINs 0003 and 0004. No other substantive changes, all other requirements remain unchanged.

Amendment 0004

  • Changed the Site visit time on the 9th to 10:00AM EST

  • Added attachment for contractors to provide notice of attendees: titled "Site Visit Information". Failure to submit this prior the Site Visit will result in admittance to tour the facilities- this will be strictly enforced.

Amendment 0003

-Delected Base and Option Years for "Program Management"

  • Added: RFI Questions and Answers

-Added: Sprinkler Inspection Reports

Statement of Work

Five-Year Obstruction Inspection of Sprinkler System

Coatesville VA Medical Center

  1. Scope

The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.

  1. Applicable Standards

All work shall comply with NFPA 25 (current edition) and VA policies and directives.

  1. Requirements

The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.

3.1. Building 1 Annual Inspection

The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.

3.2. Sprinkler System Maintenance & Internal Inspection

A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139. Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:

Base Year- Services for Buildings 1, 2, 3

Option Year 1- Services for Buildings 4, 6, 7

Option Year 2- Services for Buildings 8, 9, 38

Option Year 3- Services for Buildings 39, 57, 59

Option Year 4- Services for Buildings 69, 138, 139

Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.

3.3. Miscellaneous Maintenance Repairs

Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.

  1. Deliverables

Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.

  1. Government Responsibilities

The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.

  1. References

The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.

Documents26
36C24426Q0415 0005.docxDOCX
Site Visit Information 07-9-2026.docxDOCX
36C24426Q0415 0004.docxDOCX
RFI Q and As.docxDOCX
36C24426Q0415 0003.docxDOCX
36C24426Q0415.docxDOCX
36C24426Q0415 0001.docxDOCX
36C24426Q0415 0002.docxDOCX
SCA 2015-5791 Rev 31.pdfPDF
852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdfPDF
SPKLR9-2026 Blank.xlsxXLSX
SPKLR138E-2026 Blank.xlsxXLSX
SPKLR69-2026.xlsxXLSX
SPKLR7-2026 Blank.xlsxXLSX
SPKLR38-2026 Blank.xlsxXLSX
SPKLR57-2026 Blank.xlsxXLSX
SPKLR59-2026.xlsxXLSX
SPKLR139-2026.xlsxXLSX
SPKLR4-2026 Blank.xlsxXLSX
SPKLR39-2026 Blank.xlsxXLSX
SPKLR8-2026 Blank.xlsxXLSX
SPKLR6-2026.xlsxXLSX
SPKLR138-2026 Blank.xlsxXLSX
SPKLR3-2026 Blank.xlsxXLSX
SPKLR2-2026 Blank.xlsxXLSX
SPKLR1-2026 Blank.xlsxXLSX

Contact

Name
Chris Clements
Phone
(205) 349-9891
Address
Coatesville, PA 19320
Full source recordfrom SAM.gov
Type
Combined Synopsis/Solicitation
Title
Fire Suppression Sprinklers at Coatesville VAMC
Active
Yes
Base Type
Combined Synopsis/Solicitation
Notice Id
eadf4f80a21a4ec8b1c50fd9136b7f3a
Naics Code
811310
Department
DEPARTMENT OF VETERANS AFFAIRS
Posted Date
Jul 22, 2026
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/87ff211558e6427bb528d943ca99b600/download?fn=36C24426Q0415%200005.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f4426d982bf94a86b613bc7f1666f712/download?fn=Site%20Visit%20Information%2007-9-2026.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/67ef470052784d7da05ab9625bc0f53e/download?fn=36C24426Q0415%200004.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/03e67fe30d7f4b98b1b935d58b59cf26/download?fn=RFI%20Q%20and%20As.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/66734be1accf49cb98e6ef6ccfbd5ccf/download?fn=36C24426Q0415%200003.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6347722d08ab4b8c9eacd464ef21dc91/download?fn=36C24426Q0415.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/57a53f461c62459ea98d1a532126f22c/download?fn=36C24426Q0415%200001.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/32766a40ef264d6cb87caebb0793dc32/download?fn=36C24426Q0415%200002.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/20c9ac17e8614f9ca255cdd39fb47452/download?fn=SCA%202015-5791%20Rev%2031.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f42421b963a544a391e3727799417f8b/download?fn=852.219-75%20MUST%20SIGN%20AND%20RETURN%20WITH%20PROPOSAL.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a49bd08c736d4eb39d8e66378198343b/download?fn=SPKLR9-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ff2433973e0f43e69c5e14102b3bc8fd/download?fn=SPKLR138E-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d2d9dca2bec3411eabdb5c1eea472453/download?fn=SPKLR69-2026.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/76c58ad39e01449597a0bb2261212bd1/download?fn=SPKLR7-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/12c8dd90659448bd890d80d4d1063808/download?fn=SPKLR38-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2c504243ad8642f288cec7506ae9fedf/download?fn=SPKLR57-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/96c7d39bf8ea4efcb4a3a27323046d4e/download?fn=SPKLR59-2026.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/705927cbe7154400944c1929160ac429/download?fn=SPKLR139-2026.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a4f022069e5543a39c2557fd4e372132/download?fn=SPKLR4-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7578983d16a34760bc085012bbddeedb/download?fn=SPKLR39-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9fb1c299889742fc8618ebd52d5fbdd7/download?fn=SPKLR8-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c6c0272efcfe443a9f927a7d909d97e7/download?fn=SPKLR6-2026.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a9bde33678e84ea2a0d44e5595d3a395/download?fn=SPKLR138-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b2172db5d9d84bbcb1d705d93196a17b/download?fn=SPKLR3-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/059577e88c5049f38f82335e895a8305/download?fn=SPKLR2-2026%20Blank.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/73eb667cbef44e8990bf96415f2f0822/download?fn=SPKLR1-2026%20Blank.xlsx
Point Of Contact
Type
primary
Email
christopher.clements1@va.gov
Phone
2053499891
Full Name
Chris Clements
Type
secondary
Email
edward.ferkel@va.gov
Full Name
Edward Ferkel
Description Text
**Amendment 0005** - Deleted requirements for CLINs 0003 and 0004. No other substantive changes, all other requirements remain unchanged. **Amendment 0004** - Changed the Site visit time on the 9th to 10:00AM EST - Added attachment for contractors to provide notice of attendees: titled "Site Visit Information". Failure to submit this prior the Site Visit will result in admittance to tour the facilities- this will be strictly enforced. **Amendment 0003** -Delected Base and Option Years for "Program Management" - Added: RFI Questions and Answers -Added: Sprinkler Inspection Reports **Statement of Work** **Five-Year Obstruction Inspection of Sprinkler System** **Coatesville VA Medical Center** 1. Scope The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges. 2. Applicable Standards All work shall comply with NFPA 25 (current edition) and VA policies and directives. 3. Requirements The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name. 3.1. Building 1 Annual Inspection The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC. 3.2. Sprinkler System Maintenance & Internal Inspection A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139. Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed: **Base Year**- Services for Buildings 1, 2, 3 **Option Year 1**- Services for Buildings 4, 6, 7 **Option Year 2**- Services for Buildings 8, 9, 38 **Option Year 3**- Services for Buildings 39, 57, 59 **Option Year 4**- Services for Buildings 69, 138, 139 Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided. 3.3. Miscellaneous Maintenance Repairs Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction. 4. Deliverables Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions. 5. Government Responsibilities The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation. 6. References The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.
Response Dead Line
Jul 27, 2026
Full Parent Path Name
DEPARTMENT OF VETERANS AFFAIRS.DEPARTMENT OF VETERANS AFFAIRS.244-NETWORK CONTRACT OFFICE 4 (36C244)
Place Of Performance
Zip
19320
City
Code
14712
Name
Coatesville
State
Code
PA
Name
Pennsylvania
Country
Code
USA
Name
UNITED STATES
Solicitation Number
36C24426Q0415

Source: SAM.gov (notice eadf4f80a21a4ec8b1c50fd9136b7f3a), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.