Generate a quick AI overview of this bid, pulled from its details and the attached documents.
This project aims to establish a modernized golf facility at Naval Base San Diego by improving the outdated infrastructure of the Admiral Baker Golf Course. This comprehensive design-build project will completely renovate, reconfigure, and modernize the entire 18-hole course layout. By replacing deteriorated utilities, upgrading water resource systems, and reshaping the playing landscape, this project will resolve ongoing drainage issues, optimize operational efficiency for MWR/Community Recreation staff, and minimize player safety hazards. Ultimately, these extensive upgrades will create a highly accessible, safe, and elite, commercial-quality recreation experience for all base personnel and patrons. The scope of work includes but is not limited to the following as contained in the RFP:
Site Development
Government-Furnished Materials Installation
Demolition & Site Preparation
Renovation
Restoration
"38055-6500""MILLINGTON""TN""USA""DET MILLINGTON""5720 INTEGRITY DRIVE""J-19. HYDROLOGY AND HYDRAULIC ENGINEERING STUDY AND REPORT.pdf"121008454"file"".pdf""1""2026-07-28T20:56:31.359+00:00""babca0272f5d4ee0994d82b0ebe25ee9""public""0""public""fe91b119d1274bd8ab31d74d46a14036""0"2"0""NAVMWR-26-R-0047_ADM Baker GC Renovation.pdf"173190502"file"".pdf""1""2026-07-28T20:56:31.359+00:00""a643ca0d75e0400487fc0170657a7bb9""public""0""public""ac8a6b54b6d74f35a9eacca9fe53b2bc""0"1"0"Source: SAM.gov (notice e239314f21f94a4a8b8dc0f0f2b4b471), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →