Solicitation for the repair of C-130 Power Supply. Please see solicitation and attachments.
The contractor shall disassemble, clean, inspect, repair, reassemble, test, and finish C-130 Power Supply items (NSNs 6130-01-598-1193, 6130-01-328-4653, 6130-01-497-5713) to return them to serviceable condition. Work includes receipt and handling, inspection, basic repair, over-and-above repairs, end-item identification and marking, quality acceptance, preservation and packaging, and shipping. The contractor must provide all necessary labor, materials, parts, facilities, and equipment, and comply with OEM specifications, technical orders, and quality system requirements (ISO 9001:2015). The contract includes nine ordering periods from 01 Sep 2027 to 31 Aug 2036, with delivery 30 calendar days after receipt of asset.
We post new equipment maintenance & rental opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"73145-3303""TINKER AFB""OK""USA""CP 405 739 3450""3001 STAFF DR STE 1AC4 97E""Solicitation - FA811726RB009.pdf"1230525"file"".pdf""1""2026-09-15T16:30:06.865+00:00""639c9adb69fa4b3492c1004240cd16b1""public""0""public""6998c0dfb86a4778a420c740cc739885""0"6"0""Sole Source Justification (SSJ).pdf"566981"file"".pdf""1""2026-09-15T16:30:06.865+00:00""397fedf1fa1249788700cc282ddad320""public""0""public""b8c38cf90d56490d8a4904394a14169b""0"5"0""Transportation.pdf"92877"file"".pdf""1""2026-09-15T16:30:06.865+00:00""691975467b814a289b088025f1f5f972""public""0""public""12fb08a704b74d9ca461a1f262d49951""0"4"0""Packaging.pdf"79864"file"".pdf""1""2026-09-15T16:30:06.865+00:00""bae1900cc7f44235947bf0e0a7d02448""public""0""public""df1e785ab9be4f90b1f462a94a7bf559""0"3"0""Performance Work Statement (PWS).pdf"498508"file"".pdf""1""2026-09-15T16:30:06.865+00:00""a3ab19bd02014dcda7bac39a578dad2f""public""0""public""7c3a6c0534f045a6bac7ed1a82694686""0"2"0""Exhibit A CDRL.pdf"1061269"file"".pdf""1""2026-09-15T16:30:06.865+00:00""a6fd6cdce418417f805891caec05085c""public""0""public""b04c9dcb4f7b411eaea297318888504c""0"1"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice e16c54dde7e644e48b698d81fc5268da), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.