Read the notice and its 9 attached documents and pull out the scope, the deadlines and what you have to submit.
The Federal Emergency Management Agency (FEMA) hereby issues this Request for Proposal (RFP) for Region 2 Building C-54 at Naval Weapon Station Earle in New Jersey Comprehensive Facility Upgrades. The upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
The contractor shall provide all labor, equipment, tools, materials, parts, and supplies that are necessary to perform the facility infrastructure upgrades at Building C-54 at Naval Weapons Station Earle in New Jersey in the forms of roof repair, interior / exterior doors replacements and upgrades, exterior cement repairs and patching of loading dock and adjacent areas, sidewalk expansion of warehouse dock to building side door, patio renovation, and Regional Response Coordination Center (RRCC) workspace modernization to ensure safe, secure, and reliable operations in support of disaster response and ongoing FEMA mission needs.
A mandatory site visit will be conducted. Contractors will provide a list of attendees, prior to site visit. Contractors are required to bring Identification to the site visit and are subject to vehicle inspection prior to being granted access to the base. Mandatory Site Visit is scheduled for Tuesday, September 1, 2026, at the following location: Naval Weapons Station Earle (NWSE) 201 New Jersey Route 34, Bldg. C-54 Colts Neck, NJ 07722
Please Note Security Information for NWS Earle: Naval Weapons Station Earle’s security performs a background check on all personnel entering the Naval Base. Driver’s must be U.S. citizens and are required to present a valid driver’s license, vehicle registration, and proof of insurance. All vehicles, exterior and interior, will be thoroughly inspected by base security.
QUESTIONS: Questions regarding this Request for Proposal (RFP) shall be directed via email to brenda.cruzrodriguez@fema.dhs.gov and a copy to brendaliz.pinero@fema.dhs.gov. Telephone inquiries will not be honored. All questions must be received no later than Tuesday, September 8, 2026, at 10:00 am ET.
RESPONSES: Responses regarding this RFP shall be directed via email to brenda.cruzrodriguez@fema.dhs.gov and a copy to brendaliz.pinero@fema.dhs.gov. All responses must be received no later than Friday, September 11, 2026, at 11:00 am ET.
We post new general contractors opportunities in New Jersey as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""10007""New York""NY""USA""1 World Trade Center""52nd Floor""2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.xlsx"12354"file"".xlsx""1""2026-08-20T15:02:38.027+00:00""3fd93a85e88444f7a0c5f7e4cb9ff5cb""public""0""public""f0be801573384be488059b3318d923bc""0"9"0""2.2.1(g) Attachment G-CLIN Pricing Excel Sheet.pdf"568165"file"".pdf""1""2026-08-20T15:02:38.027+00:00""a95e41d2376e4ffd996a89004fad2ba1""public""0""public""e5d7c1cec78f4a4d840373c5a221530c""0"8"0""2.2.1(f) Attachment F-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf"813960"file"".pdf""1""2026-08-20T15:02:38.027+00:00""f98b5a8bea6346d6a3791832df889950""public""0""public""8c68ee1fcb264915be237215a9183b24""0"7"0""2.2.1(e) Attachment E-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf"704270"file"".pdf""1""2026-08-20T15:02:38.027+00:00""6981e5eb34f44c53b7291b528a2ec022""public""0""public""f29a9ae1902241baa40e9e18f79260be""0"6"0""2.2.1(d) Attachment D-Notice to Offerors-Statement of Contractor Assurance.pdf"542357"file"".pdf""1""2026-08-20T15:02:38.027+00:00""52352f8d773c4e1a89fde1df0275715c""public""0""public""3623cad75e74446d87a8333bb007c1b7""0"5"0""2.2.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf"1071056"file"".pdf""1""2026-08-20T15:02:38.027+00:00""fac49e339fe2451cb2916d4450829cf4""public""0""public""4ad578fabec84ddd8ee354b5768ed452""0"4"0""2.2.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf"762944"file"".pdf""1""2026-08-20T15:02:38.027+00:00""2efac6506f51464e8a90cbc3022d12c6""public""0""public""8fe2221c8ba8424499d27c8a17d1c883""0"3"0""2.2.1(a) Attachment A-SOW_CONSOLIDATED-Roof Doors RRCC_Concrete_ v4_08.04.2026 Security Edits.pdf"820222"file"".pdf""1""2026-08-20T15:02:38.027+00:00""8c760ed7b9754488a0050db4a0e7cfd0""public""0""public""87777bfbc3f94580be05396c34bb4086""0"2"0""2.2.1 Solicitation 70FBR226R00000016.pdf"2360181"file"".pdf""1""2026-08-20T15:02:38.027+00:00""3611d2d0352a4e9f8d717f15ffd4aefd""public""0""public""4ee5811405954f65bcdf097e2d4d3302""0"1"0"Most New Jersey work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice e16ab1a44c9d4d99997d6f8d8b2edb3b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.