Light RFP
Federal · SAM.gov · Alabama

FORT BENNING UESC RFP

Due Jul 29, 2026·1 day left·General ConstructionView official posting ↗
Issuing agency
Department of Defense
Method
Solicitation
Category
NAICS 541330
PIN
W912DY26RA071
Location
Alabama
Posted
Jun 29, 2026
Takeaways by LightRFP AI
  • The contract aims to acquire energy and water conservation services to reduce consumption, utility costs, and related maintenance, repair, and replacement (MRR) costs.
  • Work may include distributed generation, energy storage, ongoing commissioning, and other technologies to enhance energy resilience and mission assurance.
  • The solicitation is issued as a Solicitation (RFP) under NAICS 541330, with the place of performance at Fort Benning, GA.
  • Proposals are due by 2026-07-29 at 10:00 AM Mountain Time.
  • Requirement: The primary point of contact is Kara Malto at 256-895-7448 or KARA.L.MALTO@USACE.ARMY.MIL; secondary contact is James Ziegler.
  • Requirement: The contractor must implement all ECMs (energy conservation measures) during the implementation period between contract award and final acceptance by the Procuring Contracting Officer.
  • Requirement: MRR savings claimed must be directly related to installed ECMs.

AI-generated, verify all details against the official documents.

Description

The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies.

MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring Contracting Officer (PCO).

Documents4
oppMgmtLink.xhtmlXHTML
index.xhtmlXHTML
PIEE_Solicitation_Module_Vendor_Access_Instructions.pdfPDF
Document 4Link

Contact

Name
Kara Malto
Phone
(256) 895-7448
Address
AL 31905
Full source recordfrom SAM.gov
Type
Solicitation
Title
FORT BENNING UESC RFP
Active
Yes
Base Type
Solicitation
Notice Id
e1652323c94d453b80a1c53e244d8f04
Naics Code
541330
Department
DEPARTMENT OF DEFENSE
Posted Date
Jun 29, 2026
Categorized By
llm
Office Address
State
AL
Zipcode
35898-0000
Country Code
USA
Point Of Contact
Type
primary
Email
KARA.L.MALTO@USACE.ARMY.MIL
Phone
256-895-7448
Full Name
Kara Malto
Type
secondary
Email
james.e.ziegler@usace.army.mil
Full Name
James Ziegler
Description Text
The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring Contracting Officer (PCO).
Response Dead Line
Jul 29, 2026
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE ARMY.USACE.OTHER_DIVISION.W2V6 USA ENG SPT CTR HUNTSVIL
Place Of Performance
Zip
31905
Street Address
Fort Benning GA
Solicitation Number
W912DY26RA071

Source: SAM.gov (notice e1652323c94d453b80a1c53e244d8f04), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.