Read the notice and its 4 attached documents and pull out the scope, the deadlines and what you have to submit.
The purpose of this amendment is to extend the solicitation closing date by two weeks from August 28, 2026 to September 11, 2026. All other terms and conditions of the solicitation remain unchanged.PROJECT TITLE: JOHN DAY FISH PUMP REHABILITATION PROJECT LOCATION: JOHN DAY LOCK AND DAM, RUFUS, OR DESCRIPTION: REMOVAL, REFURBISHMENT, AND REPLACEMENT OF MAJOR COMPONENTS OF FISH PUMP UNIT 1, INCLUDING BUT NOT LIMITED TO SHAFTS, BEARINGS, BEARING BRACKETS, AND RIGHT-ANGLE DRIVE GEARBOXES.MAGNITUDE OF CONSTRUCTION: BETWEEN $5,000,000 - $10,000,000NAICS: 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION SIZE STANDARD: $45,000,000SOCIO-ECONOMIC CONSIDERATIONS: TOTAL SMALL BUSINESS SET-ASIDE Bid Opening: Monday, September 14th, 2026, at 10:00 AM Pacific Daylight Time (PDT). Will send TEAMs link once BID is received.
Due to CMMC access requirements, in order to gain access to CUI attachments, please verify your organization has a minimum CMMC Level 1 Self verification and submit your CMMC Unique Identifier Number and CAGE Code via email to joseph.b.jarvis@usace.army.mil and cory.r.pfenning@usace.army.mil.BIDS DUE: Friday, September 11th, 2026, at 09:00 PM Pacific Daylight Time (PDT).BID OPENING: Monday, September 14th, 2026, at 10:00 AM Pacific Daylight Time (PDT).
We post new general contractors opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"97204-3495""PORTLAND""OR""USA""KO CONTRACTING DIVISION""333 SW FIRST AVE""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127N26BA031¬iceType=SolicitationNotice"0"link""1""2026-07-27T18:30:37.901+00:00""b1612eeeaf9e416c8561e352bfed34f7""public""0""PIEE Solicitation Module Link for W9127N26BA031""public""e649dffea6d24cf6b47444dd54962550""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-07-27T18:30:37.901+00:00""2227a34598274e5182bf76ea7bed5acd""public""0""Web Based Training for the PIEE Solicitation Module""public""0f1ab47aae374773b33107bc9b6a83d1""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-07-27T18:30:37.901+00:00""e4132e22cc204f96a7d44bdb63ad2e68""public""0""Registration Instructions for the PIEE Solicitation Module""public""1085f221dc444850b39c842818ebaf1b""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-07-27T18:30:37.901+00:00""307f6bfaf8754e38bb51aa71ab78b012""public""0""Department of Defense Procurement Toolbox""public""c5b3113406e846a185050132f68d4b6b""0"1"0"Most Oregon work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice d8bd7e5b43874d9f8581e4f199cd316f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.