O'Donnell Dam Stabilization and Erosion Control
The contractor shall furnish all labor, equipment, materials, transportation, supervision, and technical expertise to implement erosion control treatments, including constructing a Zuni bowl headcut stabilization structure, installing a series of 3-4 one-rock dams, installing one media luna sheet-flow spreader, acquiring and transporting rock materials from Canelo Hills Preserve by hand or wheelbarrow only, and conducting Year-2 seeding and structure maintenance. All work must be performed using only hand tools, with no power tools or heavy equipment permitted, and must conform to the LCNCA Restoration Environmental Assessment.
We post new excavating opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""85004""PHOENIX""AZ""USA""ONE NORTH CENTRAL AVE""Sol_140L6426R0001.pdf"296552"file"".pdf""1""2026-09-11T14:53:02.243+00:00""2642c4968ef142c4a94960cdf2b0de92""public""0""public""b23005e175a74809970de3b57301de97""0"4"0""Attachment_2_Statement_of_Work.pdf"522365"file"".pdf""1""2026-09-11T14:53:02.243+00:00""1cb52ec5e97b48dca27681fc82243f4f""public""0""public""79d2a2ee823844e08045cf3db432aabd""0"3"0""Attachment_1_Request_for_Quotes.pdf"512971"file"".pdf""1""2026-09-11T14:53:02.243+00:00""44adcd8beffc4251ad2131618d5a2e11""public""0""public""790a2c9c96bb4b5e9c966316c7efbc88""0"2"0""Attachment_3_Wage_Determinations.pdf"441504"file"".pdf""1""2026-09-11T14:53:02.243+00:00""76ff4cb9710c4b47b256060bcd824ab7""public""0""public""4848274f0edb475fa3d818838f15ae42""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice c7d4c63ab9314be1bed5515c1550dc2e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.