Read the notice and its 4 attached documents and pull out the scope, the deadlines and what you have to submit.
Request for White Papers
Project Title: Independent Air Supply
Authority: 10 U.S.C. § 4022
Primary NAICS Code: 541330 — Engineering Services (Military and Aerospace Equipment)
Primary PSC Code: 4310 — Compressors and Vacuum Pumps
Arnold Engineering Development Complex (AEDC) at Arnold AFB, TN, is issuing this Request for Whitepapers (RWP) through the AEDC Velocity Alliance Consortium and SAM.gov. The strategic objective of this project is to establish an independent, secondary, and dedicated conditioned air supply to an existing test cell.
The scope of this project encompasses all design, analysis, procurement, documentation, fabrication, installation, inspection, demonstration, and testing necessary to provide a complete and functional pressure and temperature-controlled air supply to the test cell.
The Government reserves the right to award up to two prototype agreements for the initial proof of concept milestones (1-3).
Note to interested parties: Some documents in this posting are labeled Distribution D and export controlled. For access to these requirements, contact the Contracting/Agreements Officer with your company's CAGE. Once Joint Certification Program and CMMC status are verified, the documents will be sent via DoD SAFE.
We post new architecture and design opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"37389-1332""ARNOLD AFB""TN""USA""CP 931 454 7841""100 KINDEL DR STE A332""RWP_Independent Air Supply.pdf"332462"file"".pdf""1""2026-08-18T20:17:27.562+00:00""6605089f97314f68828146f349bc81c6""public""0""public""baab1b29317f4ab9a857ff6a6633da1d""0"10"0""Statement of Objectives (SOO).pdf"98729"file"".pdf""1""2026-08-18T20:17:27.562+00:00""c6988cd742b643878738a281159e2858""public""0""public""10808c964e1b489ab2695f9539e83df8""0"9"0""SOO_Appendix B_Design Review Expectations.pdf"1034499"file"".pdf""1""2026-08-18T20:17:27.562+00:00""c991ee55ef574a439a59fbba234d7809""public""0""public""f8e0a72b52134cc888c5294dfd7febcc""0"5"0""SOO_Appendix C_AEDC Standards.pdf"26009021"file"".pdf""1""2026-08-18T20:17:27.562+00:00""6d050f8c81ad4544bdd117e2f56c32fe""public""0""public""63dd796384bf47e4b6c3b4ef5feaa15f""0"4"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice c700a5c11b214bcc940364cc51aaf173), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.