Read the notice and its 15 attached documents and pull out the scope, the deadlines and what you have to submit.
The Federal Emergency Management Agency (FEMA) hereby issues this Request for Proposal (RFP) Amendment 0001 for Region 2 Building C-54 at Naval Weapon Station Earle in New Jersey for HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse to improve system reliability, maintain appropriate indoor environmental conditions, and support continued facility operations.
The contractor shall provide a comprehensive inspection and all labor, equipment, tools, materials, parts, and supplies that are necessary to inspect, remove, replace, repair, install, test, and commission heating, ventilation, and air conditioning systems at Building C-54 at Naval Weapons Station Earle in New Jersey. The work includes replacement of four (4) rooftop HVAC units, removal and installation of two (2) cooling units for the server room, and repair or replacement of two (2) warehouse heating and ventilation units.
Refer to Section L - Instructions, Conditions, and Notices to Bidders for additional updated information. All CLINS need to be proposed to be elegible for award.
RESPONSES: Responses regarding this RFP Amendment 0001 shall be directed via email to brenda.cruzrodriguez@fema.dhs.gov and a copy to brendaliz.pinero@fema.dhs.gov. All responses must be received no later than Monday, September 14, 2026, at 11:00 am ET.
09/05/2026 Contract Opportunity has been updated to include the following supporting documentation:
Q&A: Questions and Answers
Solicitation 70FBR226R00000018 with updated corresponding attachments below:
Attachment E - Wage Determination 2015-4195 Revision. 33 Dated 7/30/2026
Attachment F - CLIN Pricing Excel Sheet
Attachment G - C54 BMS Spec Sheet HON 9000 Controller
Attachment H - C54 As-Bilt 1 Roof Plan Office Area
Attachment I - C54 As-Bilt 2 Roof Plan 2 Roof Replacement
Attachment J - C54 As-Bilt 3 Roof Plan 3 T&E Lab
Attachment K - C54 As-Bilt 4 Roof Plan 4 Foundation Sections
Attachment L - C54 As-Bilt 5 Roof Plan 5 HVAC Expansion
09/10/2026 Contract Opportunity has been updated and Solicitation amended to include the following supporting documentation:
Solicitation Amendment 70FBR226R00000018_0001
Attachment A - Statement of Work updated as of 09/09/2026
**Attachment B - **NWSE Building C-54 A100 Floor Plan
-** Attachment C** - Notice to Offerors-Statement of Contractors Assurance
Attachment D - Evaluation Factors NWSE HVAC
Attachment E - Wage Determination 2015-4195 Revision. 33 Dated 7/30/2026
Attachment F - CLIN Pricing Excel Sheet (identify Solicitation number & amendment)
Attachment G - C-54 BMS Spec Sheet HON 9000 Controller
Attachment H - C-54 As-Bilt 1 Roof Plan Office Area
** **- Attachment I - C-54 As-Bilt 2 Roof Plan 2 Roof Replacement
Attachment J - C-54 As-Bilt 3 Roof Plan 3 T&E Lab
Attachment K - C-54 As-Bilt 4 Roof Plan 4 Foundation Sections
** **- Attachment L - C-54 As-Bilt 5 Roof Plan 5 HVAC Expansion
Q&A: Questions and Answers updated as 09/09/2026
RESPONSES: Responses regarding this RFP shall be directed via email to brenda.cruzrodriguez@fema.dhs.gov and a copy to brendaliz.pinero@fema.dhs.gov. All responses must be received no later than **Monday, September 14, 2026, at 11:00 am ET. ** Late proposals will not be accepted.
Offerors shall reference Solicitation Number 70FBR226R00000018_0001 on all documentation submitted in response to this
solicitation amendment.
We post new hvac opportunities in New Jersey as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""10007""New York""NY""USA""1 World Trade Center""52nd Floor""2.8.1(a) Q&A in response to RFP 09.09.26.pdf"286046"file"".pdf""1""2026-09-10T17:54:32.94+00:00""7e09817dc7ab42c48e0276242f30b26a""public""0""public""3509cbfa171f4a94a201f4f8136b3074""0"34"0""2.4.1(g) Attachment G-C54 BMS Spec Sheet HON 9000 Controller.pdf"2802223"file"".pdf""1""2026-09-10T17:54:32.94+00:00""9bf47443412544d29e80d84dede19cf2""public""0""public""1b97c49a892e4d2d8b2dadb3e41d482a""0"33"0""2.4.1(i) Attachment I-C54 As-Bilt 2 Roof Plan 2 Roof Replacement.pdf"2233133"file"".pdf""1""2026-09-10T17:54:32.94+00:00""3ada2ddbf1f5483db04e5d5f4e82117f""public""0""public""99b70d5190ec4ed69063ccbf1df77bd8""0"32"0""2.4.1(d) Attachment D-Technical Evaluation Factors-NWSE HVAC Replacement_ 07.14.26_v1_OR.pdf"1142233"file"".pdf""1""2026-09-10T17:54:32.94+00:00""6dfb0e9f8c3d4dab993918e7ff958d77""public""0""public""618eedd802f14de4b818b34ad3871e79""0"31"0""2.4.1(b) Attachment B-A100 Floor Plan.pdf"1061977"file"".pdf""1""2026-09-10T17:54:32.94+00:00""f62c517a6cd247f49827d4bd687183df""public""0""public""d560c4f9d3254590a037102547cd4f01""0"30"0""2.4.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf"203980"file"".pdf""1""2026-09-10T17:54:32.94+00:00""382477b0659e4db8a95ff5e2d6ff3baf""public""0""public""a9679b4e8bcb453d9b3a9de4288daa37""0"29"0""2.4.1(c) Attachment C-Notice to Offerors-Statement of Contractor Assurance.pdf"552856"file"".pdf""1""2026-09-10T17:54:32.94+00:00""494656a6436b414c896e4d9daa0ea524""public""0""public""f952ca1ee1584380b7f171a93c6d7b32""0"28"0""2.4.1(j) Attachment J-C54 As-Bilt 3 Roof Plan 3 T&E Lab.pdf"284806"file"".pdf""1""2026-09-10T17:54:32.94+00:00""e7f66e6bc67741308c847f8bcb2a2b84""public""0""public""917ec18a14874f6b8cbeab4a58098d94""0"27"0""2.4.1(e) Attachment E-Wage Determination 2015-4195 Rev.33 7.30.26.pdf"257994"file"".pdf""1""2026-09-10T17:54:32.94+00:00""bae4cb454dc94a2c9fbbb2136f9cd7f8""public""0""public""386d088c09694fc6a4e246438a01b81e""0"26"0""2.4.1(l) Attachment L-C54 As-Bilt 5 Roof Plan 5 HVAC Expansion.pdf"111629"file"".pdf""1""2026-09-10T17:54:32.94+00:00""357e9b87d7424f7087c538b71b2caa58""public""0""public""6f035f1a60f0433d9ba2741b76949027""0"25"0""2.4.1(k) Attachment K-C54 As-Bilt 4 Roof Plan 4 Foundation Sections.pdf"171627"file"".pdf""1""2026-09-10T17:54:32.94+00:00""a25817117c5a452ea2d8e2fcf8c8975b""public""0""public""bd8b2e6a6aa84a57b99d907e79774d2b""0"24"0""2.4.1(h) Attachment H-C54 As-Bilt 1 Roof Plan Office Area.pdf"255010"file"".pdf""1""2026-09-10T17:54:32.94+00:00""3ba076d3a1d741df9d5dd6829c1a7055""public""0""public""26e132ebaa944732b73a8c882260fde0""0"23"0""2.4.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx"14125"file"".xlsx""1""2026-09-10T17:54:32.94+00:00""f99daed90be64f888cbecc8c73254b87""public""0""public""4a6a4c3695b847ab93859345f15cd7f4""0"22"0""2.4.1(a) Attachment A-SOW-NWSE HVAC Replacement revised v2 09.09.26.pdf"279162"file"".pdf""1""2026-09-10T17:54:32.94+00:00""7fd97474f0af461c96f57a12c3984ec2""public""0""public""042693fbaebf4b94bd9975a6c4fd6a4d""0"21"0""2.4.1 70FBR226R00000018_0001.pdf"7926124"file"".pdf""1""2026-09-10T17:54:32.94+00:00""a75a94f1685d488aa7d6208402c1f870""public""0""public""bf80b82912b642b8b32fd3d7722449ff""0"20"0"Most New Jersey work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice c6198894862e44d1b41830e921ac5248), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.