Read the notice and its 3 attached documents and pull out the scope, the deadlines and what you have to submit.
The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits (as required), and incidentals necessary to remove three (3) existing ADA security portals located within the NPTU Security Building and construct a new secure floor-to-deck partition wall incorporating three (3) new security doors. The Contractor shall also perform all associated demolition, electrical work, security system rough-in, painting, cleanup, testing, and restoration necessary to provide a complete and operational installation.
All work shall be accomplished in accordance with all Federal, State, Local Regulations and the guidelines, but not limited to the following:
International Building Code
International Mechanical Code
International Plumbing Code
National Electrical Code (NFPA 70)
National Fire Code (NFPA 1)
Base Architectural Compatibility Guide
Unified Federal Criteria (UFC)
Unified Facilities Guide Specifications (UFGS)
The Government intends to award a single Firm-Fixed-Price (FFP) contract IAW the procedures at RFO 12.201-1 and RFO Part 36 respectively. A mandatory site visit will be held within an estimated three calendar days from the issuance of the solicitation. A draft Statement of Work (SOW) is attached for review. The anticipated date of award is no later than 30 September 2026. Please be advised this is not a request for quote.
We post new interior installation opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"29404-5021""JOINT BASE CHARLESTON""SC""USA""CP 843 963 5155""101 E HILL BLVD""DKGV 1160823 Portal Replacement - Door Frame Reconstuction Draft Statement of Work.pdf"211736"file"".pdf""1""2026-08-20T14:40:05.415+00:00""a2aa5e0629c146e7bf9aabd7531d6a3a""public""0""public""f4f69b206cc84e9eacaf414d76c91aa9""0"6"0""DKGV 1160823 Portal Replacement- Door Frame Reconstuction Draft Statement of Work.pdf"160128"file"".pdf""1""2026-08-19T18:30:32.095+00:00""7775df4b9aca4edeb053077fd1e5ee9a""public""2026-08-20T14:40:05.415+00:00""1""public""f4519e105e164ecd97962be70522e869""0"5"0""2026-08-20T14:40:05.415+00:00""DKGV 1160823 Portal Replacement- Door Frame Reconstuction Attachment 1 Special Conditions.pdf"119812"file"".pdf""1""2026-08-19T18:30:32.095+00:00""65a7a8add4b248c58747de53c9ba6159""public""0""public""43e524faa55e428db3a960398dbbf12d""0"4"0""DKGV 1160823 Portal Replacement - Door Frame Reconstuction Attachment 2 Door Drawing.pdf"619454"file"".pdf""1""2026-08-19T18:30:32.095+00:00""33f5a495be7d41cb82e50086a750a9a6""public""0""public""182a0fea95a647e6a6ed2e60f5c28355""0"2"0"Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice c1c6fd4f1e344e3a98d12129e88c54fe), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.