Read the notice and its 20 attached documents and pull out the scope, the deadlines and what you have to submit.
The Federal Emergency Management Agency (FEMA) hereby issues this Request for Proposal (RFP) Amendment 0001 for Region 2 Building C-54 at Naval Weapon Station Earle in New Jersey Comprehensive Facility Upgrades. The upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.
The contractor shall provide all labor, equipment, tools, materials, parts, and supplies that are necessary to perform the facility infrastructure upgrades at Building C-54 at Naval Weapons Station Earle in New Jersey in the forms of interior / exterior doors replacements and upgrades, exterior cement repairs and patching of loading dock and adjacent areas, sidewalk expansion of warehouse dock to building side door, reinforcement and finish restoration of the designated training room wall to support future audio-visual enhancements and Regional Response Coordination Center (RRCC) workspace modernization to ensure safe, secure, and reliable operations in support of disaster response and ongoing FEMA mission needs.
RESPONSES: Responses regarding this RFP Amendment 0001 shall be directed via email to brenda.cruzrodriguez@fema.dhs.gov and a copy to brendaliz.pinero@fema.dhs.gov. All responses must be received no later than Monday, September 14, 2026, at 4:00 pm ET.
Amendment 001: Contract Opportunity has been updated and Solicitation amended to include the following supporting documentation:
Solicitation Amendment 70FBR226R00000016_0001
Attachment A - Statement of Work CONSOLIDATED-Doors_RRCC_Wall_Concrete_v8_09/09/2026
Attachment B - NWSE Building C-54 A100 Floor Plan
Attachment C - Specifications for Doors NWSE
Attachment D - RRCC Scale Diagram
Attachment E - RRCC Wall and Doors Picture 1
Attachment F - RRCC Wall and Doors Picture 2
Attachment G - RRCC Wall and Doors Picture 3
Attachment H - RRCC Wall and Doors Picture 4
Attachment I - RRCC Wall and Doors Picture 5
Attachment J - RRCC Wall and Doors Picture 6
Attachment K - RRCC Wall and Doors Picture 7
Attachment L - Training Room-Planar Video Wall 8x4 DLP 1.2 2K Nit
Attachment M - Notice to Offerors-Statement of Contractors Assurance
Attachment N - Evaluation Factors
Attachment O - Wage Determination Davis Bacon No. NJ20260037 Mod 1 dated 05/18/2026
Attachment P - CLIN Pricing Excel Sheet (Updated)
- Q&A: Questions and Answers updated as 09/09/2026
We post new general contractors opportunities in New Jersey as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""10007""New York""NY""USA""1 World Trade Center""52nd Floor""2.8.1 Consolidation Project NWSE Questions 09.09.26_v3.pdf"2549674"file"".pdf""1""2026-09-11T02:31:43.243+00:00""345e4c6a9dd14a2fb5f4e8d4df0fb750""public""0""public""542f631c74a14a32a90ea7d186e1175d""0"48"0""2.8.1(a) Consolidation Q&A-Question 16 Reference.pdf"362018"file"".pdf""1""2026-09-11T02:31:43.243+00:00""7dc306078269430bb9048db7df1e3bbf""public""0""public""abd53e8e8d5e4dfcbdd68514030edba1""0"47"0""2.4.1(b) Attachment B-NWSE Building C-54 A100 Floor Plan.pdf"1574700"file"".pdf""1""2026-09-11T02:31:43.243+00:00""5786a9a9f393423b959e20adabac2622""public""0""public""dd3208771f1145d4800cb8b02e40a541""0"46"0""2.4.1(e) Attachment E-RRCC Wall and Doors Picture 1.pdf"831431"file"".pdf""1""2026-09-11T02:31:43.243+00:00""10677ddbcded45ff973ac3a0290c9ef3""public""0""public""6774f3c94a914de5abe920d90e39c33c""0"45"0""2.4.1(c) Attachment C-Specs for Doors for Earle_07.28.26_OR.pdf"1282388"file"".pdf""1""2026-09-11T02:31:43.243+00:00""3de27a0e02934c688137a03535336ec5""public""0""public""6e49f4b919c9487781cd57c166cdc143""0"44"0""2.4.1(f) Attachment F-RRCC Wall and Doors picture 2.pdf"852426"file"".pdf""1""2026-09-11T02:31:43.243+00:00""3faeaa67be694f06bc28a2ed34dc0535""public""0""public""1ba8194f57484a7f96b9325e5b579237""0"43"0""2.4.1(i) Attachment I-RRCC Wall and Doors Picture 5.pdf"856671"file"".pdf""1""2026-09-11T02:31:43.243+00:00""259b4c1ebdf8428eb4c3cf3d2819beb9""public""0""public""d6a95f73fc12412883a81b9c0a6416be""0"42"0""2.4.1(j) Attachment J-RRCC Wall and Doors Picture 6.pdf"591568"file"".pdf""1""2026-09-11T02:31:43.243+00:00""abd5fca4f63f45c89a3d6df4698b686b""public""0""public""7f595957fbb243cd9a0bb33dcf171a29""0"41"0""2.4.1(o) Attachment O-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf"873711"file"".pdf""1""2026-09-11T02:31:43.243+00:00""f1b92d3771104321a47ba0f796fd1475""public""0""public""5fc8cf0aa45a40e6a149b14992dcc298""0"40"0""2.4.1(g) Attachment G-RRCC Wall and Doors Picture 3.pdf"752768"file"".pdf""1""2026-09-11T02:31:43.243+00:00""4004fbbf204a41f18c4c487e979b0586""public""0""public""a355d9f960474c30ae94fd2b67b9a83e""0"39"0""2.4.1(d) Attachment D-RRCC Scale Diagram.pdf"316201"file"".pdf""1""2026-09-11T02:31:43.243+00:00""35f8bf32040c4ba0b2343a012a2b0ae2""public""0""public""ebc00e238f6649d184aa45f953f91cc1""0"38"0""2.4.1(l) Attachment L-Training Room Planar_VideoWall 8x4 DLP 1.2 2K Nit.pdf"815498"file"".pdf""1""2026-09-11T02:31:43.243+00:00""f36317f288504daa980d22e49e65f8cd""public""0""public""6b2fafb9f0b64fc7a91ac8d7eb5a58b3""0"37"0""2.4.1(m) Attachment M-Notice to Offerors-Statement of Contractor Assurance.pdf"734808"file"".pdf""1""2026-09-11T02:31:43.243+00:00""f0e31d324fe849a9a77d15b74a09a5bc""public""0""public""aadde75e7a084e79baebaf5fa74168b3""0"36"0""2.4.1(k) Attachment K-RRCC Wall and Doors Picture 7.pdf"592832"file"".pdf""1""2026-09-11T02:31:43.243+00:00""392c56e4f48a4573bb7163bf6009c3ff""public""0""public""a36ce5271a06481b811acb813afca206""0"35"0""2.4.1(p) Attachment P-CLIN Pricing Excel Sheet.pdf"86375"file"".pdf""1""2026-09-11T02:31:43.243+00:00""42d134b5905a42f5b8585188f8d64f18""public""0""public""d5dd7e5b7a87465ca8562d3d96d56ec6""0"34"0""2.4.1(h) Attachment H-RRCC Wall and Doors Picture 4.pdf"703443"file"".pdf""1""2026-09-11T02:31:43.243+00:00""f22e7ec6f9f94d2aa52b0136de514f96""public""0""public""26aec710e0464e78a7e22e2a7577e894""0"33"0""2.4.1(a) Attachment A-SOW_CONSOLIDATED-Doors_RRCC_Wall_Concrete_ v8_09.09.2026 Security Edits.pdf"327364"file"".pdf""1""2026-09-11T02:31:43.243+00:00""f1dccd83a64f4012b90e76222695422a""public""0""public""2e4cbb23a6534e31bd7019fa7efbab1f""0"32"0""2.4.1(n) Attachment N-Technical Evaluation Factors-Consolidation Requirement_08.03.2026.pdf"308581"file"".pdf""1""2026-09-11T02:31:43.243+00:00""0efda043131d49a59ad8647ada62359d""public""0""public""b0d024ea3bbe435590b7fea372e0d4c3""0"31"0""2.4.1(p) Attachment P-CLIN Pricing Excel Sheet.xlsx"12437"file"".xlsx""1""2026-09-11T02:31:43.243+00:00""3442d39b165b4e09851ad34fee3ff0fa""public""0""public""ce413295025e4069b7ec5e994dafeaa9""0"30"0""2.4.1 Solicitation 70FBR226R00000016_001.pdf"8809849"file"".pdf""1""2026-09-11T02:31:43.243+00:00""d8dacce2bd9c440a8ca95e552e248335""public""0""public""780e3f55096a4f2a801bf9a1ad35ffe3""0"29"0"Most New Jersey work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice c085eb3c7e294c5b8e26421ccd8982b8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.