Generate a quick AI overview of this bid, pulled from its details and the attached documents.
** Please see the attachment Vendor QA Consolidation and Appendix A - List of Currently Used Equipment for the answers to all questions submitted **
This Solicitation has been amended please see attachment FA940126Q0025 - AMENDED for complete information.
Response deadline date has changed from Monday, 13 July 2026 to Tuesday, 04 August 2026 at 1400 hours (MDT)
We have added a site visit, which is being held on 16 July 2026 at 1300 hours (MDT).
See PWS for complete details
This project will consist of the procurement, removal, disposal, installation, commissioning, and maintenance of two (2) Ingersoll Rand RS37i Air Compressors, one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator, and two (2) Ingersoll Rand Xe-70M controllers. Equivalent models are accepted; however, bids on equivalent models will need to include a brochure of all the technical specifications for review. Equivalent models will need to either have an integrated desiccant dryer or separate desiccant dryer that can handle the volume of two air compressors. The Contractor will be responsible for the complete installation of two (2) Ingersoll Rand RS37i Air Compressors and one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator.
The Contractor shall procure and provide a “turnkey” solution in accordance with the manufacturer’s installation requirements and standard commercial best practices for the following equipment:
Manufacture Model # Description Quantity
Ingersoll Rand RS30-37i/RS30I TAS Fixed Speed Rotary Compressor w/ Dryer 2
Ingersoll Rand PSG-30 Polysep PSG-30 Oil Water Separator 1
Equivalent models must meet the following specifications:
Description Required Specifications Quantity
Air Compressor 2
• 120 PSI each
• 170 CPM each
• Needs to have integrated air dryer
• Must be air-cooled
Oil Water Separator 1
• 390 CPM
• 12-gal absorption module volume
• 32-120 temperature operating range
In addition, the government requires a preventive (scheduled) and corrective (troubleshooting, repairs, and replacements) maintenance contract for all existing shop air compressor systems (See Appendixes in PWS for all currently used equipment), for the base year and four option years. The Contractor shall provide all management, labor, material, parts, equipment, transportation, certifications, and tools necessary to maintain, service, and calibrate the shop air compressors, air dryers and associated ancillary equipment.
Source: SAM.gov (notice be82bd6fdd1045c7b4651cc81ccf66a3), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →