Reroute Power Supply
POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov
a licensed electrician remove the 2 conduit tripping hazard and reroute the supply power and control wires overhead to the mixing blender. The breaker panel for the 240-volt 3 phase supply power is located in the next room where the electrician will
have to run new conduit through a wall to the mixing blender. The control wire panel is located within 10 feet from the mixing blender. We prefer that the electrician uses rigid conduit and seals all connections to prevent electrical arching. We do
have fine dust particles from wheat and soy which can become highly flammable. The kitchen possesses a dust collecting system which gathers most of the dust particles.
NAICS Code: 238210
This is being solicited 100% Small Business
Magnitude: Under $25,000
Site Visit
Date: 23 July 2026
Time: 10:00 AM
Location: 3645 E. Chipman RD, Phoenix AZ 85040
POC: Marvin Draper
POC Email: marvin.draper@usda.gov
All question must be emailed (no other means will be accepted) to erick.plamann@usda.gov no later than 12:00 PM Central Time on 7/29/0226.
All offers must be emailed (no other means will be accepted) to erick.plamann@usda.gov no later than 12:00 PM Central Time on 8/14/0226.
Source: SAM.gov (notice bbf95338c4544393a4f4d8a1bc7994ad), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →