Read the notice and its 4 attached documents and pull out the scope, the deadlines and what you have to submit.
The ANGRC requires this Passive Optical Network (PON) equipment to modernize base infrastructure, ensuring secure, high-bandwidth, and highly reliable data transmission across both Unclassified (NIPR) and Secret (SIPR) enclaves. This hardware directly supports Command and Control (C2) and warfighting operations by increasing network capacity while reducing the physical footprint and power requirements of the base's IT infrastructure. The current system has EOL parts that are obsolete and leave the system liable for complete failure.
See attached Parts List for product details. This is a brand name requirement see attached Tellabs justification and approval document.
We post new it & software opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20762-7001""JB ANDREWS""MD""USA""CP 240 612 5676""1349 LUTMAN DR""FA286026QA002 ANGRC Chassis Replacement Combo.pdf"298553"file"".pdf""1""2026-09-09T15:26:28.416+00:00""4c638db613c245148bf0c5f459a16b16""public""0""public""9b88f75da35246fa825b8e85725f3042""0"11"0""Patrs List.xlsx"11837"file"".xlsx""1""2026-09-09T15:26:28.416+00:00""66d62d911c994083bff515ccfaf0f9fc""public""0""public""befb3e79720440a7ab2ce5ad94a9d61e""0"8"0""FA286026QA002 Clauses And Provisions.pdf"188628"file"".pdf""1""2026-09-09T15:26:28.416+00:00""d6683d763f9e49bdaede2a7c5e98dd1e""public""0""public""118cdbfaa3ad41cd9283d4d7903935bc""0"4"0""Tellabs justification_and_approval_document CO signed.pdf"2681686"file"".pdf""1""2026-09-09T15:26:28.416+00:00""dc08fde8d3704b36b94759d23c92c0d2""public""0""public""8dc9cc16bbcc4b42b77980fc6c2ebd7a""0"3"0"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice a90ab486e70f486b94cab64b5f87ff5e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.