Z2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRM

Due Aug 24, 2026·27 days left·Electrical, Plumbing, Demolition / Abatement, FlooringView official posting ↗
Issuing agency
Department of Veterans Affairs
Method
Solicitation
Category
Construction · NAICS 236220
PIN
36C25526R0142_1
Location
Wichita, KS
Posted
Jul 22, 2026
Takeaways by LightRFP AI
  • The Department of Veterans Affairs is soliciting proposals for construction and renovation of approximately 1,500 SF of existing clinical space in Building 2 at the Robert J. Dole VA Medical Center in Wichita, KS to prepare for new cardiac catheterization equipment.
  • The work includes selective demolition, MEP system modifications, medical gas modifications, electrical boom arm relocation, ceiling sterile air curtain upgrades, new partitions and doorways, interior finishes, structural supports, utilities, shielding modifications, conduits, and hazardous materials abatement.
  • Construction must be performed in an occupied, operational clinical facility with carefully phased construction, strict ICRA adherence, infection control, noise/vibration limits, and daily coordination with VA COR and end users.
  • Proposals are due by August 24, 2026 at 2:00 PM Central Time and must be submitted electronically to jennifer.hill@va.gov and tonesha.king@va.gov.
  • Original bid bonds must be received at the Contracting Office in Leavenworth, KS prior to the solicitation closing date and time.
  • The solicitation uses a Best Value Tradeoff source selection process with evaluation factors including Prime Contractor Construction Experience, Project Execution, Key Personnel Experience, Prime Contractor's Safety Plan, and Past Performance.
  • Requirement: Bid guarantee of 20% of bid price or $3,000,000, whichever is less, per FAR 52.228-1.
  • Requirement: Performance and Payment Bonds required per FAR 52.228-15.
  • Requirement: Contractors and Joint Ventures must be certified in SBA VetCert and registered in SAM.gov at time of proposal due date through award.
  • Requirement: Compliance with Construction Wage Rate Requirements (Davis-Bacon) per FAR 52.222-5.
  • Requirement: Buy American Act compliance for construction materials per FAR 52.225-10.
  • Requirement: Insurance for work on a government installation per FAR 52.228-5.

AI-generated, verify all details against the official documents.

Description

Contractor shall perform construction and renovation of existing in Building 2 including, but not limited, rooms to: 216-2, 216A-2,217-2, 217A-2, 218-2, & other supporting spaces at the Robert J. Dole VAMC campus. This project will prepare approximately 1,500 SF of existing clinical space for the installation and operation of a new cardiac catheterization equipment, with the associated control and equipment room.

All construction work shall be performed in full compliance with the completed set of bidding documents, including all contract drawings, specifications, and design narratives associated with this solicitation. The general contractor shall furnish all labor, supervision, materials, tools, and equipment necessary to execute the required scope of work.

Construction will consist of, but is not limited to, the following:

• Selective demolition and removal of existing systems, finishes, and equipment as identified.

• Replacement or relocation of Architectural, MEP equipment, including medical gas modification,/electrical boom arm relocation, ceiling sterile air curtains upgrades, build-in control room desk/casework, additional wall outlets; including mechanical, plumbing, lighting, fire protection, and electrical systems as required.

• Reconfigured partitions and doorways, including new architectural walls, doors, frames, and hardware.

• Instillation of new interior finishes including ceiling, flooring, wall protection, and paint.

Statement of Work for Project 589A7-25-203, Site Prep for Cath Lab Equipment  April 10, 2026 2

• Site preparation for installation of government-furnished catheterization lab equipment, including structural supports, utilities, shielding modification, conduits, and interfaces.

• Hazardous materials abatement, including asbestos, lead, and mold as identified or discovered during construction, following all applicable VA, EPA, OSHA, and state/local regulations.

• All other items as described in the contract documents

This construction work is located in an occupied, operational clinical facility and must be performed in a manner that allows medical care services to continue uninterrupted throughout construction, This requires carefully phased construction, strict adherence to ICRA, infection control, noise/vibration limits, and daily coordination with the VA COR and end users.

Construction may also include the abatement of any asbestos as identified on the provided drawings. The construction of this project will take place in a very busy occupied building and is to be completed to allow medical care functions to be maintained uninterrupted throughout construction – necessitating carefully phased construction and coordination with VA COR/users, including strict adherence to ICRA requirements.

Documents5
S02 Attachment-Final Drawings 37PGS - Copy (1).pdfPDF
S02 Attachment- Specs Combined-676 PGS (2).pdfPDF
S02 Attachment- PPQ.docxDOCX
S02-Attachment-Final SOW Construction-updated.pdfPDF
S02-36C25526R0142_1.pdfPDF

Contact

Name
Tonesha Y King
Phone
(913) 946-1971
Address
Wichita, KS 67218
Full source recordfrom SAM.gov
Type
Solicitation
Title
Z2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRM
Active
Yes
Base Type
Solicitation
Notice Id
a84f53c932ee42078c82ccdc5458427e
Naics Code
236220
Department
DEPARTMENT OF VETERANS AFFAIRS
Posted Date
Jul 22, 2026
Point Of Contact
Type
primary
Email
tonesha.king@va.gov
Phone
913-946-1971
Title
Contract Specialist
Full Name
Tonesha Y King
Description Text
Contractor shall perform construction and renovation of existing in Building 2 including, but not limited, rooms to: 216-2, 216A-2,217-2, 217A-2, 218-2, & other supporting spaces at the Robert J. Dole VAMC campus. This project will prepare approximately 1,500 SF of existing clinical space for the installation and operation of a new cardiac catheterization equipment, with the associated control and equipment room. All construction work shall be performed in full compliance with the completed set of bidding documents, including all contract drawings, specifications, and design narratives associated with this solicitation. The general contractor shall furnish all labor, supervision, materials, tools, and equipment necessary to execute the required scope of work. Construction will consist of, but is not limited to, the following: • Selective demolition and removal of existing systems, finishes, and equipment as identified. • Replacement or relocation of Architectural, MEP equipment, including medical gas modification,/electrical boom arm relocation, ceiling sterile air curtains upgrades, build-in control room desk/casework, additional wall outlets; including mechanical, plumbing, lighting, fire protection, and electrical systems as required. • Reconfigured partitions and doorways, including new architectural walls, doors, frames, and hardware. • Instillation of new interior finishes including ceiling, flooring, wall protection, and paint. Statement of Work for Project 589A7-25-203, Site Prep for Cath Lab Equipment  April 10, 2026 2 • Site preparation for installation of government-furnished catheterization lab equipment, including structural supports, utilities, shielding modification, conduits, and interfaces. • Hazardous materials abatement, including asbestos, lead, and mold as identified or discovered during construction, following all applicable VA, EPA, OSHA, and state/local regulations. • All other items as described in the contract documents This construction work is located in an occupied, operational clinical facility and must be performed in a manner that allows medical care services to continue uninterrupted throughout construction, This requires carefully phased construction, strict adherence to ICRA, infection control, noise/vibration limits, and daily coordination with the VA COR and end users. Construction may also include the abatement of any asbestos as identified on the provided drawings. The construction of this project will take place in a very busy occupied building and is to be completed to allow medical care functions to be maintained uninterrupted throughout construction – necessitating carefully phased construction and coordination with VA COR/users, including strict adherence to ICRA requirements.
Response Dead Line
Aug 24, 2026
Full Parent Path Name
DEPARTMENT OF VETERANS AFFAIRS.DEPARTMENT OF VETERANS AFFAIRS.255-NETWORK CONTRACT OFFICE 15 (36C255)
Place Of Performance
Zip
67218
City
Code
79000
Name
Wichita
State
Code
KS
Name
Kansas
Country
Code
USA
Name
UNITED STATES
Solicitation Number
36C25526R0142_1

Source: SAM.gov (notice a84f53c932ee42078c82ccdc5458427e), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.