The 101st MSC Office is issuing this combined synopsis/solicitation for the procurement of wireless communications infrastructure materials, conduit, grounding equipment, and supporting electrical hardware in support of the SC GASNTi2 BLOCK 1 project.
This procurement includes a mandatory requirement for a purchased ISO shipping container in which all materials must be delivered and stored. Upon acceptance of delivery, title and ownership of the shipping container will permanently transfer to the United States Government.
All materials must strictly conform to the specifications outlined in the Statement of Work (SOW) and the attached List of Materials (LOM) (or approved "or-equal" equivalents).
2.1. Submission Instructions
Offerors must submit their quotes via email to the primary Government Points of Contact (POCs) listed below no later than September 18, 2026, at 5:00 PM EST. Late submissions will not be evaluated.
2.2. Quote Package Requirements
The quote package must include the following distinct elements:
Technical Quote:
A completed bill of materials pricing sheet matching the item numbers in Attachments (LOM).
Detailed product specification sheets for any proposed "or-equal" items, including a side-by-side comparison chart matching the salient characteristics defined in the LOM.
Conformance statement confirming that all materials will be delivered palletized for forklift transportation within a new or highly refurbished ISO shipping container that will become the permanent property of the Government upon delivery.
Price Quote:
A firm-fixed-price (FFP) quote detailing unit and extended pricing for all LOM items.
Crucial Pricing Note: The total cost of the ISO shipping container, including its initial freight and logistics, must be fully integrated and amortized within the unit prices of the delivered materials. No separate demurrage, retention, or container rental line items will be accepted.
Representations and Certifications:
Completed copy of FAR 52.212-3 (Offeror Representations and Certifications—Commercial Products and Commercial Services) or confirmation of an active and up-to-date registration in the System for Award Management (SAM.gov).
The Government intends to award a Firm-Fixed-Price contract resulting from this solicitation to the responsible offeror whose quote conforms to the solicitation and represents the Lowest Price Technically Acceptable (LPTA).
Quotes will be evaluated based on the following two factors:
Factor 1: Technical Acceptability
The technical evaluation will be graded on a Pass/Fail (Acceptable/Unacceptable) basis. To be rated "Technical Acceptable," the quote must demonstrate:
Strict conformance to the exact part numbers specified in Attachment #1, OR technical data sheets proving 100% equivalency to all listed salient physical, functional, and performance characteristics for proposed "or-equal" substitutions.
Unequivocal acceptance of all Statement of Work terms, including base security access, delivery terms, and the permanent transfer of ownership of the delivery/storage shipping container (SOW Section 2, Item 5).
Factor 2: Price
Pricing will be evaluated for fairness and reasonableness. Award will be made to the lowest-priced quote that has been determined to be technically acceptable.
FOB Destination:
Seymour Johnson Air Force Base - Goldsboro, NC
Minot Air Force Base - North Dakota
Grissom Air Reserve Base - Indiana
Whiteman Air Force Base - Missouri
Kirtland Air Force Base - Albuquerque, NM
Goldwater Air National Guard Base - Phoenix, AZ
McConnell Air Force Base - Wichita, KS
Tinker Air Force Base - Oklahoma City, OK
General Mitchell Air Refueling Wing - Milwaukee, WI
McGhee Tyson Air National Guard Base - Louisville, TN
Fairchild Air Refueling Wing - Spokane, WA
Delivery Timeline: Delivery must be coordinated with the Government POCs to occur during normal business hours, excluding Federal holidays. All items must be delivered fully weatherproofed, palletized, and secured inside the purchased ISO container.
The contractor must deliver all materials identified in the List of Materials (LOM) to multiple Air Force bases, including Seymour Johnson AFB, Minot AFB, Grissom ARB, Whiteman AFB, Kirtland AFB, Goldwater ANG Base, McConnell AFB, Tinker AFB, General Mitchell ARW, McGhee Tyson ANG Base, and Fairchild ARW. All materials must be delivered in a new or highly refurbished ISO shipping container that will become the permanent property of the Government upon delivery. The contractor must submit a technical quote with a completed bill of materials pricing sheet, product specification sheets for or-equal items, and a conformance statement. A firm-fixed-price quote must integrate the container cost into unit prices. The contractor must also submit representations and certifications (FAR 52.212-3 or SAM.gov registration). Delivery must be coordinated with Government POCs during normal business hours, excluding Federal holidays, and all items must be delivered fully weatherproofed, palletized, and secured inside the purchased ISO container.
We post new electrical opportunities in Maine as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"04401-8005""BANGOR""ME""USA""KO FOR MEANG DO NOT DELETE""105 MAINEIAC AVE SUITE 505""Solicitation - W50S8326QA002.pdf"3374061"file"".pdf""1""2026-08-21T00:15:20.712+00:00""14df915fe79848cdb467a20430bf7fac""public""0""public""c7c997f94e8a40ea8d4ce471407e75f9""0"12"0""Seymour Johnson AFB LOM.pdf"2280894"file"".pdf""1""2026-08-21T00:15:20.712+00:00""78770dc2f8744e4dbcf89cf32b446aa5""public""0""public""18c010b994264ec59271d59be580e8ad""0"11"0""Whiteman AFB LOM.pdf"2180886"file"".pdf""1""2026-08-21T00:15:20.712+00:00""9b227af1a77945a0b09aea00330e5a95""public""0""public""671d20a32bd0460398e787bd7b253d7e""0"10"0""Kirtland LOM.pdf"1680578"file"".pdf""1""2026-08-21T00:15:20.712+00:00""f85f15a9a9224765be98992f8aed0dd5""public""0""public""f56f50cfc9b14adc8817084f0a6dd8c0""0"9"0""Fairchild AFB LOM.pdf"1667000"file"".pdf""1""2026-08-21T00:15:20.712+00:00""1580daf09e42405bb64dc88c5c733b34""public""0""public""cc86d6044cf64449ad5be5e8cc3a67fc""0"8"0""Grissom ARB LOM.pdf"1543054"file"".pdf""1""2026-08-21T00:15:20.712+00:00""ddeeb036a1944182be1c2e4337952e5b""public""0""public""a7adc5be75b14d8297526cea46a4fbfe""0"7"0""Goldwater LOM.pdf"1528171"file"".pdf""1""2026-08-21T00:15:20.712+00:00""18a8d298079945dabfcce2b7ef8bbf64""public""0""public""bfb1c03ad41f45dbbb7d5be36e24e204""0"6"0""Tinker LOM.pdf"1443409"file"".pdf""1""2026-08-21T00:15:20.712+00:00""d0a8567867e1483e8b9e87f05598d2d8""public""0""public""91374f0509174b5794fbb7ffb1d70faa""0"5"0""McConnell LOM.pdf"1468465"file"".pdf""1""2026-08-21T00:15:20.712+00:00""6a610555f80d436f80320e7b5e46d4a9""public""0""public""9a3e9aa48f814baf83469c992831c439""0"4"0""General Mitchell ANGB LOM.pdf"1335914"file"".pdf""1""2026-08-21T00:15:20.712+00:00""8575daf0a29b48138e4947c9214187bb""public""0""public""ec0816bacf0a4afbb730622e9c4ab69a""0"3"0""Minot SOW LOM.pdf"1181984"file"".pdf""1""2026-08-21T00:15:20.712+00:00""ddfd4b01a61646f5ba8eb4afd054639e""public""0""public""e0697ad0385c468f9705ba59f7468181""0"2"0""McGhee Tyson LOM.pdf"1090827"file"".pdf""1""2026-08-21T00:15:20.712+00:00""be7027d567cd41a995266618db3b0595""public""0""public""8885a05d3e9f47c5ac30ff970fd387c1""0"1"0"Most Maine work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice a825706e006f43a6a6711129a72ce19f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.