Requirement to mill and overlay asphalt at roadway improvements to Sherman Ave, Buford Ave, Meade Ave, and B-52 parking lots as shown on the construction drawings.
Asphalt roadway improvements to the alley on the west side of Grant Park as shown on the construction drawings.
Asphalt roadway improvements to the alley on the east side of Grant Park as shown on the construction drawings.
Asphalt roadway improvements to West Warehouse Rd as shown on the construction drawings.
"66027-1391""FT LEAVENWORTH""KS""USA""MISSION AND INSTI CONTRACTING""BLDG 338""Asphalt Contract Specs.pdf"1451570"file"".pdf""1""2026-07-22T19:29:05.001+00:00""3695e20f787a45ccb74e8f96b448a6e9""public""0""public""f6584afa889f4abe8a4714befaccd8a9""0"5"0""Drawings 01_Rev 03_Pavement.pdf"4975888"file"".pdf""1""2026-07-22T19:29:05.001+00:00""1d524761ee0e4f7fbef8c5dcae4f9347""public""0""public""e13eb7dbe14544a286f18559ac853d48""0"4"0""Drawings 01_Rev 03_Pavement 20260722.pdf"4975888"file"".pdf""1""2026-07-22T19:29:05.001+00:00""4d65cae47eb44278bdc2e58052908b10""public""0""public""08834fd10f1741a78accfa51a76570ff""0"3"0""SOW Asphalt Pavement Rehab REV2.pdf"158269"file"".pdf""1""2026-07-22T19:29:05.001+00:00""2892104642be4b7dafa5a40bda248963""public""0""public""0c156792d79340edb660dfc0589debea""0"2"0""Sol_W91QF4-26-B-A007 Asphalt.pdf"6647248"file"".pdf""1""2026-07-22T19:29:05.001+00:00""3a2a7b97fc10455da4c3aa54c68f5ffe""public""0""public""3fb91e50b02f49f8b439af5c4c3de97f""0"1"0"Source: SAM.gov (notice a4c3050264f54a96920c4786c019123b), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →