NIWTP Biosolids Sludge Dryer Alternative Building D/B

Due Aug 14, 2026·17 days left·Electrical, Plumbing, Demolition / AbatementView official posting ↗
Issuing agency
International Boundary and Water Commission: U
Method
Solicitation
Category
Construction · NAICS 236220
PIN
191BWC26R0010
Location
Rio Rico, AZ
Posted
Jul 21, 2026
Takeaways by LightRFP AI
  • The USIBWC is soliciting design-build proposals for a new Sludge Dryer Building at the Nogales International Wastewater Treatment Plant in Rio Rico, Arizona.
  • The project includes design and construction of the building, demolition of existing belt filter presses, and relocation of a metal structure.
  • The contract type is Firm Fixed Price with a period of performance of 365 calendar days after Notice to Proceed.
  • The estimated magnitude of the project is between $1 million and $5 million.
  • Proposals are due on August 14, 2026, at 3:00 PM MDT.
  • A site visit is scheduled for July 24, 2026, at 10:00 AM local time, requiring a signed NDA and PPE.
  • Questions are due on July 29, 2026, at 3:00 PM MDT.
  • The procurement method is a negotiated Request for Proposals (RFP) using two-phase design-build selection procedures.
  • Requirement: The bidder shall furnish a bid guarantee in an amount of not less than 20 percent of the bid price or three million dollars ($3,000,000), whichever is lesser.
  • Requirement: For contracts that exceed $150,000.00, the Contractor shall furnish a Performance Bond with a penal amount of not less than 100% of the price of the contract at the time of award.
  • Requirement: For contracts that exceed $150,000.00, the Contractor shall furnish a Payment Bond with a penal amount of not less than 100% of the price of the contract at the time of award.

AI-generated, verify all details against the official documents.

Description

Note: Time for site visited has been corrected to 10AM Arizona Time.


The USIBWC is issuing a Solicitation (negotiated) for the design and construction (design-build) of the Sludge Dryer Building within the USIBWC’s Nogales International Wastewater Treatment Plant Project, in Rio Rico, Santa Cruz County, Arizona. This new building shall house the sludge dryer purchased for the plant.

  • Description of the Work:

  • Work as noted in the SOW:

  • The project includes:

  • Design and construction of a new building to accommodate the sludge dryer system and associated equipment.

  • Demolition of the existing belt filter presses and related polymer system components (excluding concrete foundations, overhead structure, and electrical motor control centers).

  • Relocation of an existing three-sided metal structure.

  • All associated site work, utilities, permitting, and commissioning to deliver a fully operational, code-compliant, and ready-to-use facility.

  • The final product shall be a fully commissioned, turn-key building with all required utilities (water, sanitary sewer, communications, electrical, fire protection, etc.) and site improvements, ready for immediate use upon completion.

    1. Project Location
  • Nogales International Wastewater Treatment Plant

Santa Cruz County, Arizona

(31°26'56.58"N, 110°57'49.33"W)

    1. Procurement Approach
  • Type: Design-Build (DB)

  • Contract Structure: Firm Fixed Price

  • Period of Performance: 365 calendar days after Notice to Proceed (NTP)

  • Set-Aside: The Government anticipates a small business set-aside, subject to market research results.

    1. Scope of Work Highlights
  • Phase 1: Design

  • Site investigation, surveying, geotechnical investigations, and design development.

  • Preparation of construction documents, technical specifications, and all required reports.

  • Coordination with stakeholders and regulatory agencies.

  • Phase 2: Construction

  • Site preparation, demolition, and relocation activities.

  • Construction of the new sludge dryer building and installation of all required systems.

  • Quality control testing, commissioning, and project closeout.

  • Compliance:

  • All work must comply with federal, state, and local codes, including NEPA, OSHA, ADA/ABAAS, and applicable environmental and safety regulations.

  • The contractor is responsible for all required permits and coordination with utility providers.

    1. Submission Requirements (When Solicitation is Issued)
  • Interested offerors will be required to submit:

  • Qualifications and relevant experience with similar design-build projects.

  • Technical approach and project management plan.

  • Past performance information.

  • Price proposal.

  • NDA for Site visit

    1. Anticipated Timeline
  • Solicitation Release: 16, 2026

  • Site Visit: July 24, 2026 at 10 AM Local. An NDA is required.

  • Questions due: July 29, 2026 at 3 PM MDT.

  • Proposal Due Date: August 14, 2026 at 3PM MDT.

    1. Additional Information
  • This notice is a request for proposals. The solicitation, specifications, and drawings will be made available on SAM.gov.

  • Magnitude is between $1 million and $5 million.

  • All interested parties are encouraged to monitor SAM.gov for updates.

  • Questions regarding this notice may be submitted via email to the Contracting Officer listed in the forthcoming solicitation.

A site visit is scheduled for July 24, 2026, at 10AM local time. Names of individuals who plan to attend along with an IBWC Form 358 Non-Discloser Agreement (NDA) shall be furnished before 3:00 PM MDT (CO’s local time) on Wednesday, July 22, 2026, by email submission to seone.jones@ibwc.gov. PPE will be required for this site visit (hard hat, safety shoes and vest). IBWC will not provide PPE. A maximum of 2 per company will be allowed. Vendors must check in with a valid ID at the administration building and let them know they are attending a site visit/walk through. All visitors must be escorted by IBWC personnel.

Photos/videos will be allowed with some restrictions. No photos of gates, fences, security features such as cameras, access points or IBWC personnel are allowed on this site visit. Only photos/video of the current sludge drying equipment will be allowed. An NDA (IBWC_Form_358_Nondisclosure_Agreement - NIWTP Biosolids Sludge Dryer Alternative Building D/B.pdf) will need to be completed prior to the site visit. Potential bidders can complete an NDA at the Pre-Proposal Conference/Site Visit.

All work is proposed to be completed within three hundred and sixty (365) calendar days after the Notice to Proceed.

The time for completion of final paperwork is included in the three hundred and sixty (365) calendar days. The time stated for completion shall include final cleanup of the premises. The final design and construction Contract durations will be negotiated with Offerors during the Phase Two technical proposal evaluations.

The Solicitation will be issued pursuant to FAR Subpart 36.3 - Two-Phase Design-Build Selection Procedures. Phase One shall include evaluation of technical qualifications and capability to perform and Phase Two shall include evaluation of technical proposal and price.

Prospective bidders shall be registered in the System for Award Management (SAM) with an active Unique Entity Indentifier (UEI) in order to be eligible to receive an award from solicitation and have the NAICS code listed above under Reps & Certs. For more information, visit the website at https://www.sam.gov.

Notification of any changes or amendments to the Solicitation will be issued only at https://www.sam.gov. It is the prospective bidder's responsibility to check the website daily for any updates, amendments or any additional information. The Government will not be held responsible for any information a prospective bidder does not receive once the information is issued on the Internet.

All responsible sources must submit a bid to be considered by the Agency.

Attachment

191BWC26R0010.pdf

SOW NIWTP Biosolids Sludge Dryer Alternative Building DB.pdf

IBWC Form 358 Nondisclosure Agreement - CUI.pdf

RRFTP-0027- EQUIP. DIST.& DETAILED LAYOUTS-2026.06.07.pdf

2006 Geotech Report - MLE Improvements.pdf

AZ0025607_NIWTP_Final_Permit_Red.pdf

Nogales_Asbestos_and_Lead-Paint_Survey.pdf

NIWTP_Upgrade-Expansion_EA.pdf

NIWTP Location Maps.pdf

NIWTP_Upgrade-Expansion_FONSI.pdf

Documents11
191BWC26R0010 0001.pdfPDF
191BWC26R0010.pdfPDF
SOW NIWTP Biosolids Sludge Dryer Alternative Building DB.pdfPDF
IBWC Form 358 Nondisclosure Agreement - CUI.pdfPDF
RRFTP-0027- EQUIP. DIST.& DETAILED LAYOUTS-2026.06.07.pdfPDF
2006 Geotech Report - MLE Improvements.pdfPDF
AZ0025607_NIWTP_Final_Permit_Red.pdfPDF
Nogales_Asbestos_and_Lead-Paint_Survey.pdfPDF
NIWTP_Upgrade-Expansion_EA.pdfPDF
NIWTP Location Maps.pdfPDF
NIWTP_Upgrade-Expansion_FONSI.pdfPDF

Contact

Name
Seone Michael Jones
Address
Rio Rico, AZ 85648
Full source recordfrom SAM.gov
Type
Solicitation
Title
NIWTP Biosolids Sludge Dryer Alternative Building D/B
Active
Yes
Base Type
Solicitation
Notice Id
a3a5e76ef3a9472b99a4f13bad6b543a
Naics Code
236220
Department
INTERNATIONAL BOUNDARY AND WATER COMMISSION: U.S.-MEXICO
Posted Date
Jul 21, 2026
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4fb707f780cb475bbdda2c7e6ee49f07/download?fn=191BWC26R0010%200001.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b32b36712da1422fa7033cc01fe81f48/download?fn=191BWC26R0010.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3edab9b9920f42afa03fa4c1d780e42c/download?fn=SOW%20NIWTP%20Biosolids%20Sludge%20Dryer%20Alternative%20Building%20DB.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a237377f7df8404babd8cf8493699015/download?fn=IBWC%20Form%20358%20Nondisclosure%20Agreement%20-%20CUI.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/772c413c565141d1b06c9abdb47d91b4/download?fn=RRFTP-0027-%20EQUIP.%20DIST.%26%20DETAILED%20LAYOUTS-2026.06.07.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b9612552d0124d09b37d8c4819756db8/download?fn=2006%20Geotech%20Report%20-%20MLE%20Improvements.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ba94fabdc56e410582ec22aa9c750fe3/download?fn=AZ0025607_NIWTP_Final_Permit_Red.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4959a66d0fa647988d27c2fff8b4df9d/download?fn=Nogales_Asbestos_and_Lead-Paint_Survey.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bb83d554d7934b1aa150ab5d5661f45a/download?fn=NIWTP_Upgrade-Expansion_EA.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8f9a430c4bfa48d29938cd570f4f8445/download?fn=NIWTP%20Location%20Maps.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/46f15141b4754b29bc579d918f2a0cc2/download?fn=NIWTP_Upgrade-Expansion_FONSI.pdf
Point Of Contact
Type
primary
Email
seone.jones@ibwc.gov
Full Name
Seone Michael Jones
Description Text
**Note: Time for site visited has been corrected to 10AM Arizona Time.** -------------------------------------------------------------------------------------- The USIBWC is issuing a Solicitation (negotiated) for the design and construction (design-build) of the Sludge Dryer Building within the USIBWC’s Nogales International Wastewater Treatment Plant Project, in Rio Rico, Santa Cruz County, Arizona. This new building shall house the sludge dryer purchased for the plant. - Description of the Work: - Work as noted in the SOW: - The project includes: - **Design and construction** of a new building to accommodate the sludge dryer system and associated equipment. - **Demolition** of the existing belt filter presses and related polymer system components (excluding concrete foundations, overhead structure, and electrical motor control centers). - **Relocation** of an existing three-sided metal structure. - **All associated site work, utilities, permitting, and commissioning** to deliver a fully operational, code-compliant, and ready-to-use facility. - The final product shall be a fully commissioned, turn-key building with all required utilities (water, sanitary sewer, communications, electrical, fire protection, etc.) and site improvements, ready for immediate use upon completion. - 2. Project Location - Nogales International Wastewater Treatment Plant Santa Cruz County, Arizona (31°26'56.58"N, 110°57'49.33"W) - 3. Procurement Approach - **Type:** Design-Build (DB) - **Contract Structure:** Firm Fixed Price - **Period of Performance:** 365 calendar days after Notice to Proceed (NTP) - **Set-Aside:** The Government anticipates a small business set-aside, subject to market research results. - 4. Scope of Work Highlights - **Phase 1: Design** - Site investigation, surveying, geotechnical investigations, and design development. - Preparation of construction documents, technical specifications, and all required reports. - Coordination with stakeholders and regulatory agencies. - **Phase 2: Construction** - Site preparation, demolition, and relocation activities. - Construction of the new sludge dryer building and installation of all required systems. - Quality control testing, commissioning, and project closeout. - **Compliance:** - All work must comply with federal, state, and local codes, including NEPA, OSHA, ADA/ABAAS, and applicable environmental and safety regulations. - The contractor is responsible for all required permits and coordination with utility providers. - 5. Submission Requirements (When Solicitation is Issued) - Interested offerors will be required to submit: - Qualifications and relevant experience with similar design-build projects. - Technical approach and project management plan. - Past performance information. - Price proposal. - NDA for Site visit - 6. Anticipated Timeline - **Solicitation Release:** 16, 2026 - **Site Visit:** July 24, 2026 at **10 AM Local**. An NDA is required. - **Questions due:** July 29, 2026 at 3 PM MDT. - **Proposal Due Date:** August 14, 2026 at 3PM MDT. - 7. Additional Information - This notice is **a request for proposals**. The solicitation, specifications, and drawings will be made available on SAM.gov. - **Magnitude is between $1 million and $5 millio**n. - All interested parties are encouraged to monitor SAM.gov for updates. - Questions regarding this notice may be submitted via email to the Contracting Officer listed in the forthcoming solicitation. A site visit is scheduled for **July 24, 2026, at 10AM local tim**e. Names of individuals who plan to attend along with an IBWC Form 358 Non-Discloser Agreement (NDA) shall be furnished before 3:00 PM MDT (CO’s local time) on Wednesday, July 22, 2026, by email submission to seone.jones@ibwc.gov. PPE will be required for this site visit (hard hat, safety shoes and vest). IBWC will not provide PPE. A maximum of 2 per company will be allowed. Vendors must check in with a valid ID at the administration building and let them know they are attending a site visit/walk through. All visitors must be escorted by IBWC personnel. Photos/videos will be allowed with some restrictions. No photos of gates, fences, security features such as cameras, access points or IBWC personnel are allowed on this site visit. Only photos/video of the current sludge drying equipment will be allowed. An NDA (IBWC_Form_358_Nondisclosure_Agreement - NIWTP Biosolids Sludge Dryer Alternative Building D/B.pdf) will need to be completed prior to the site visit. Potential bidders can complete an NDA at the Pre-Proposal Conference/Site Visit. All work is proposed to be completed within three hundred and sixty (365) calendar days after the Notice to Proceed. The time for completion of final paperwork is included in the three hundred and sixty (365) calendar days. The time stated for completion shall include final cleanup of the premises. The final design and construction Contract durations will be negotiated with Offerors during the Phase Two technical proposal evaluations. The Solicitation will be issued pursuant to FAR Subpart 36.3 - Two-Phase Design-Build Selection Procedures. Phase One shall include evaluation of technical qualifications and capability to perform and Phase Two shall include evaluation of technical proposal and price. Prospective bidders shall be registered in the System for Award Management (SAM) with an active Unique Entity Indentifier (UEI) in order to be eligible to receive an award from solicitation and have the NAICS code listed above under Reps & Certs. For more information, visit the website at https://www.sam.gov. Notification of any changes or amendments to the Solicitation will be issued only at https://www.sam.gov. It is the prospective bidder's responsibility to check the website daily for any updates, amendments or any additional information. The Government will not be held responsible for any information a prospective bidder does not receive once the information is issued on the Internet. All responsible sources must submit a bid to be considered by the Agency. **Attachment** 191BWC26R0010.pdf SOW NIWTP Biosolids Sludge Dryer Alternative Building DB.pdf IBWC Form 358 Nondisclosure Agreement - CUI.pdf RRFTP-0027- EQUIP. DIST.& DETAILED LAYOUTS-2026.06.07.pdf 2006 Geotech Report - MLE Improvements.pdf AZ0025607_NIWTP_Final_Permit_Red.pdf Nogales_Asbestos_and_Lead-Paint_Survey.pdf NIWTP_Upgrade-Expansion_EA.pdf NIWTP Location Maps.pdf NIWTP_Upgrade-Expansion_FONSI.pdf
Response Dead Line
Aug 14, 2026
Full Parent Path Name
INTERNATIONAL BOUNDARY AND WATER COMMISSION: U.S.-MEXICO.INTERNATIONAL BOUNDARY AND WATER COMMISSION: U.S.-MEXICO.INTERNAT. BOUNDARY AND WATER COMM.
Place Of Performance
Zip
85648
City
Code
60180
Name
Rio Rico
State
Code
AZ
Name
Arizona
Country
Code
USA
Name
UNITED STATES
Solicitation Number
191BWC26R0010

Source: SAM.gov (notice a3a5e76ef3a9472b99a4f13bad6b543a), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.