Description of Anticipated Requirement:
The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits.
Anticipated Contract Period of Performance:
One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years.
RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors.
**RFP Amendment 02 **updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI).
**RFP Amendment 03 **updated the following attachments: Attachment 15 Section M - Evaluation Basis for Award.
**RFP Amendment 04 **updated the following attachments: Attachment 5 Cross Reference Matrix, Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award. Added Attachment 24 Use and Nondisclosure Agreement.
Questions and Answers - uploaded on 04 August 2026. Updated 05 August 2026. Updated 18 August 2026. Updated 11 September 2026.
The contractor must design, develop, integrate, test, produce, install, and deploy a Degraded Visual Environment System (DVES) for the HH-60W helicopter. The system shall provide real-time hazard detection in enroute and terminal areas, functioning effectively in ambient/artificial conditions (smoke, smog, snow, night sand/dust) and aircraft-induced conditions (brownout/whiteout). The effort includes all non-recurring engineering for installation, as well as the delivery of DVES kits, prototype and verification installation labor, familiarization, and contractor travel. The contract also requires delivery of numerous data items including software development plans, system specifications, test reports, training materials, and logistics support plans.
We post new goods & materials opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"31098-1670""ROBINS AFB""GA""USA""CP 4789543351""370 RICHARD RAY BLVD""FA855226RB001 Questions and Answers updated 091126.pdf"172515"file"".pdf""1""2026-09-11T19:41:12.883+00:00""d8edd39feda141d48453d4b1dbeb29ce""public""0""public""9c26a7b591a84c93902ddc4031cacd69""0"516"0""FA855226RB001 Questions and Answers updated 081826.pdf"105819"file"".pdf""1""2026-08-18T21:14:57.635+00:00""1e3acd55f7f1429c97ecd7f6aea49bd3""public""2026-09-11T19:41:12.883+00:00""1""public""9dc7636ef8964f8c9c4139db110d90f1""0"515"0""2026-09-11T19:41:12.883+00:00""Solicitation Amendment - FA855226RB0010004.pdf"1460386"file"".pdf""1""2026-09-11T19:41:12.883+00:00""a7691361bd2b42e3b797c09597484826""public""0""public""80995cb5f2fa43939af032bcb38c5b19""0"509"0""Solicitation Amendment - FA855226RB0010003.pdf"1458841"file"".pdf""1""2026-08-18T21:14:57.635+00:00""5c915372e4e4485b8edf1ab273661c86""public""0""public""6a636233129447ca983f7c413787e05d""0"503"0""Solicitation Amendment - FA855226RB0010002.pdf"1458683"file"".pdf""1""2026-07-31T22:12:54.036+00:00""c5fa7dafbfbc48e7be3f5ba33d8636c4""public""0""public""fdccd9ce5c4e4c5087d27cda6f4e8324""0"492"0""Solicitation Amendment - FA855226RB0010001.pdf"1458318"file"".pdf""1""2026-07-17T12:48:44.46+00:00""0b4e896b727b4a579b65c5534e92b09b""public""0""public""6ae0473c2d604ea989fe5887fffea6a4""0"483"0""FA855226RB001.pdf"23322336"file"".pdf""1""2026-07-31T22:12:54.036+00:00""07dfa5c6eb024a4c806e4d8024944abf""public""0""public""5245859efac946ae9bf08ef0ba27b179""0"453"0""FA855226RB001 RFP Attachment 1 Instructions to Register a PIEE Account.pdf"322250"file"".pdf""1""2026-07-09T21:05:04.293+00:00""17f21c0619a9405a9437a2aa83c7448c""public""0""public""1706b1d669f440448ee5f7ecda03d20b""0"445"0""FA855226RB001 RFP Attachment 2 How to Post Offer on PIEE.pdf"997549"file"".pdf""1""2026-07-09T21:05:04.293+00:00""0ee1ca0aff454b6caf4f35403c862fc8""public""0""public""035e9ad3c49e4c3ca41cddc35d23dcfa""0"414"0""FA855226RB001 RFP Attachment 4 FACTS Sheet.docx"28250"file"".docx""1""2026-07-10T13:11:13.765+00:00""2537f43f081f484a9fd5f14ac2a4419a""public""0""public""7d03389b6d3c418494e71127396d2fb2""0"217"0""FA855226RB001 Amend 04 RFP Attachment 5 Cross Reference Matrix.docx"58262"file"".docx""1""2026-09-11T19:41:12.883+00:00""0cf3418e7b4646d9bdf1189c72f56311""public""0""public""a0e2c18802284dc0995a242df222d100""0"201"0""FA855226RB001 RFP Attachment 5 Cross Reference Matrix.docx"36944"file"".docx""1""2026-07-10T13:11:13.765+00:00""7403cfa950c044fdaa188c93eeefb3dc""public""2026-09-11T19:41:12.883+00:00""1""public""8b10cd11dcb147478574ddfbb0098491""0"200"0""2026-09-11T19:41:12.883+00:00""FA855226RB001 RFP Attachment 6 Present and Past Performance Questionnaire_.docx"24000"file"".docx""1""2026-07-15T15:06:29.11+00:00""0b127749fe554cfe8fd9599c723fd466""public""0""public""c93b1de0170e4a969e6068804b9c3ee5""0"179"0""FA855226RB001 RFP Attachment 7 Transmittal Letter.docx"20024"file"".docx""1""2026-07-10T13:11:13.765+00:00""53ad17fff4d74e1f89bd0b8ea355a247""public""0""public""df645612df2d4b259d3935b3ce25010f""0"167"0""FA855226RB001 RFP Attachment 8 Client Authorization Letter.docx"18866"file"".docx""1""2026-07-10T13:11:13.765+00:00""64d707d2bf15498ba071b82b7c48f2c2""public""0""public""b4e4332b1a7745609d43ae5c40aae2b8""0"152"0""FA855226RB001 RFP Attachment 9 Subcontractor and Teaming Member Consent Form.docx"37684"file"".docx""1""2026-07-10T13:11:13.765+00:00""0480552a169f4182b8411fac62d71f83""public""0""public""09852de447594a2eb7ccd526b220343e""0"138"0""FA855226RB001 RFP Attachment 10 VPP DART-TCIR Chart.xlsx"24662"file"".xlsx""1""2026-07-10T13:11:13.765+00:00""ef9e4a21bea84ebe955e92e619bf9e22""public""0""public""84516adac0894e5e8d027aca300d706e""0"124"0""FA855226RB001 Amend 04 RFP Attachment 11 Cost Model.xlsx"134183"file"".xlsx""1""2026-09-11T19:41:12.883+00:00""992d061df77844f8aebb1eff6ada1629""public""0""public""b2e60ef56a5c44728463c48d27948020""0"112"0""FA855226RB001 RFP Attachment 11 Cost Model.xlsx"132700"file"".xlsx""1""2026-07-10T13:11:13.765+00:00""5554b0947cb6403f9f3d905f5207ec1d""public""2026-09-11T19:41:12.883+00:00""1""public""eaff837754fc47a2aa44828cd5ca44c1""0"111"0""2026-09-11T19:41:12.883+00:00""FA855226RB001 RFP Attachment 12 Cost Price Spreadsheet (TRV).xlsx"192414"file"".xlsx""1""2026-07-10T13:11:13.765+00:00""59eab2bf5f1e4a5588f86df1e9a46490""public""0""public""83ef695ab024404580ac67c00009b41b""0"99"0""FA855226RB001 RFP Attachment 13 Pre-Award Survey.pdf"263487"file"".pdf""1""2026-07-09T21:05:04.293+00:00""b0b0cb90182c4a6786891dcc720e129c""public""0""public""610a241988364d04ae4aca75998aa8e2""0"87"0""FA855226RB001 Amend 04 RFP Attachment 14 Section L.pdf"464928"file"".pdf""1""2026-09-11T19:41:12.883+00:00""5648bcc143904a6e85500fb42f5daeb3""private""0""controlled""688416e5957e43d5b560c3f896bb7c33""1"67"0""FA855226RB001 Amend 02 RFP Attachment 14 Section L.pdf"405267"file"".pdf""1""2026-07-31T22:12:54.036+00:00""e0eb0ddaa1b7460eb5d50b4f34f88cf3""private""2026-09-11T19:41:12.883+00:00""1""controlled""a00f8d8d99cf4df59dff9a41bed7b948""1"66"0""2026-09-11T19:41:12.883+00:00""FA855226RB001 Amend 04 RFP Attachment 15 Section M.pdf"312349"file"".pdf""1""2026-09-11T19:41:12.883+00:00""3ebc247a42a34c0faf2ccd8c4ecbaebe""public""0""public""daa09ea95c69475fa795b10332bd38fb""0"40"0""FA855226RB001 Amend 03 RFP Attachment 15 Section M.pdf"305219"file"".pdf""1""2026-08-18T21:14:57.635+00:00""d5aba525211b46748be7ddeaa17b8177""public""2026-09-11T19:41:12.883+00:00""1""public""424c05a3c2584bd09b266283aa3fcfa6""0"39"0""2026-09-11T19:41:12.883+00:00""FA855226RB001 Amend 02 RFP Attachment 16 Performance Work Statement (PWS) (CUI).pdf"1676476"file"".pdf""1""2026-08-04T13:14:31.106+00:00""9322a6958973446f9c8d20b08fe09a16""private""0""controlled""695814c4d3ca4b3fa5a71133d334c761""1"37"0""FA855226RB001 RFP Attachment 17 CDRLs.pdf"6645652"file"".pdf""1""2026-07-10T12:45:37.525+00:00""73096f0d3982440c98d09f323b9228a8""private""0""controlled""2243ff240f95480ca1d89b09bda555eb""1"35"0""FA855226RB001 RFP Attachment 18 Solicitation DD254.pdf"269515"file"".pdf""1""2026-07-09T21:05:04.293+00:00""4c767648bc134c84bc5393e1f1a8a92d""public""0""public""9296c59bca1d4a469b2e2f6bbd707b62""0"31"0""FA855226RB001 Amend 02 RFP Attachment 19 SRD (CUI).pdf"2256109"file"".pdf""1""2026-07-31T22:12:54.036+00:00""d6640350c5a94251bd8b7fece62ccbed""private""0""controlled""0c78d8bda43745f3973023bc352e13b7""1"25"0""FA855226RB001 RFP Attachment 20 AFMC FORM 807.pdf"49759"file"".pdf""1""2026-07-09T21:05:04.293+00:00""d4d7c179749340ee89ddb18fb56fff65""public""0""public""4d5c80fa33b547fba04a80936cb450fb""0"21"0""FA855226RB001 RFP Attachment 21 AFMC FORM 158.pdf"963057"file"".pdf""1""2026-07-10T15:29:11.938+00:00""4ccfa560e17447b99c77b6d54aeea9da""public""0""public""335f25b905084f68b2646d64b10a8616""0"10"0""FA855226RB001 RFP Attachment 22 Special Packaging Instructions.pdf"80379"file"".pdf""1""2026-07-09T21:05:04.293+00:00""4a64bdce9d2741f69644fe6bb1456fb6""public""0""public""c486aad7f01541cbaf3aff42479b5f80""0"8"0""FA855226RB001 RFP Attachment 23 Delivery Schedule.pdf"61397"file"".pdf""1""2026-07-10T12:45:37.525+00:00""7cdda826fcd7463a9d7f4e5277b2094a""private""0""controlled""9cf08bebb5bd49bfb997ce36ae45475e""1"5"0""FA855226RB001 Amend 04 RFP Attachment 24 Use and Nondisclosure Agreement.pdf"125136"file"".pdf""1""2026-09-11T19:41:12.883+00:00""ff6c745d26304db2bd7f39055cc0a76b""public""0""public""fc4963a52f0248eca4a1bfde31ce246f""0"4"0"Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice a1c3d6725680453d80ffe8269ad1e512), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.