Light RFP
Commonwealth of VA · Christiansburg, VA

IFB 27500003 College Street, Drainage Improvements Phase II

Due Aug 27, 2026·29 days left·Electrical, HVAC, Paving / SidewalksView official posting ↗
Issuing agency
Town of Christiansburg
Method
Invitation for Bids (IFB)
Category
Construction
PIN
125021
Location
Christiansburg, VA
Posted
Jul 24, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

The project consists of construction of a new prefabricated concrete building housing a new boiler/heat exchanger unit with digester gas piping and appurtenances, sludge piping, lighting, HVAC; site civil work including paving and a grading and buried piping installation; electrical, process instrumentation, SCADA integration, and piping and valve modifications in the existing Digester Building.

Documents2
27500003 IFB WWTF Digester Boiler and Heat Exchanger Building Plans.pdfPDF
27500003 IFB WWTF Digester Boiler and Heat Exchanger Project Manual.pdfPDF

Contact

Name
Tara Vance
Address
Christiansburg, VA
Full source recordfrom Virginia eVA
Id
IV125021
App
IV
Doccd
IFB
Agency
L002CHRISTIANS
Detail
Fields
Buyer
Tara Vance
Issued
7/24/26 3:40 PM
Status
Open
Closing
8/27/26 2:00 PM
Summary
The project consists of construction of a new prefabricated concrete building housing a new boiler/heat exchanger unit with digester gas piping and appurtenances, sludge piping, lighting, HVAC; site civil work including paving and a grading and buried piping installation; electrical, process instrumentation, SCADA integration, and piping and valve modifications in the existing Digester Building.
Website
www.christiansburg.org
Category
Construction
Issued By
Town of Christiansburg
Time Left
29 days
Work Location
Christiansburg, VA
Open Responses
See solicitation documents Public Opening information.
Opportunity Type
Invitation for Bids (IFB)
Pre Bid Conference
See solicitation documents for optional prebid/proposal conference/site visit.
Summary
The project consists of construction of a new prefabricated concrete building housing a new boiler/heat exchanger unit with digester gas piping and appurtenances, sludge piping, lighting, HVAC; site civil work including paving and a grading and buried piping installation; electrical, process instrumentation, SCADA integration, and piping and valve modifications in the existing Digester Building.
Attachments
Attachment Details
Url
["https://procure.cgieva.com/page.aspx/en/fil/download_public/CE97C7E1-973E-4775-9130-ABFBEDFFC1F4","https://procure.cgieva.com/page.aspx/en/fil/download_public/2E012F05-648B-463C-873C-8F0360F9E35C"]
Link
["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/CE97C7E1-973E-4775-9130-ABFBEDFFC1F4\"\">27500003 IFB WWTF Digester Boiler and Heat Exchanger Building Plans.pdf</a>","<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/2E012F05-648B-463C-873C-8F0360F9E35C\"\">27500003 IFB WWTF Digester Boiler and Heat Exchanger Project Manual.pdf</a>"]
File Guid
["CE97C7E1-973E-4775-9130-ABFBEDFFC1F4","2E012F05-648B-463C-873C-8F0360F9E35C"]
File Name
["27500003 IFB WWTF Digester Boiler and Heat Exchanger Building Plans.pdf","27500003 IFB WWTF Digester Boiler and Heat Exchanger Project Manual.pdf"]
File Size
["29645485","23480636"]
@Xmlns:Xsi
"http://www.w3.org/2001/XMLSchema-instance"
Ctn Created
["7/24/26","7/24/26"]
Ctn Title En
["IFB 27500003 College Street, Drainage Improvements Phase II - Building Plans","IFB 27500003 College Street, Drainage Improvements Phase II - Project Manual"]
Content Label
["RFx Document","RFx Document"]
Contact Name
Tara Vance
Contact Email
tvance@christiansburg.org
Status
Open
Doctype
SO
Pubdate
Jul 24, 2026
Version
0
Workloc
Christiansburg, VA
Category
Construction
Commcode
7797
Commdesc
Construction and Upgrades, Wastewater Treatment Plant
Longdesc
The project consists of construction of a new prefabricated concrete building housing a new boiler/heat exchanger unit with digester gas piping and appurtenances, sludge piping, lighting, HVAC; site civil work including paving and a grading and buried piping installation; electrical, process instrumentation, SCADA integration, and piping and valve modifications in the existing Digester Building.
Version
1871626420007993300
Buyername
Tara Vance
Closedate
Aug 27, 2026
Doccddesc
Invitation for Bids (IFB)
Docdeptcd
L002CHRISTIANS
Shortdesc
IFB 27500003 College Street, Drainage Improvements Phase II
Agencyname
Town of Christiansburg
Externalid
125021
Internalid
125021
Commlinedesc
Request for bids
Buyerdeptname
Detail Fetched
Yes
Lastupdatedate
Jul 24, 2026
Categoryshortdesc
Construction

Source: Virginia eVA (solicitation VA_EVA-IV125021), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting — always confirm requirements and deadlines with the issuing agency.