Light RFP
Commonwealth of VA · Virginia

260-A9260-018 Trail Bridge Replacement & Stream Stabilization

Due Aug 17, 2026·20 days left·Demolition / Abatement, Bridge / InfrastructureView official posting ↗
Issuing agency
Northern Virginia Community College
Method
Invitation for Bids (IFB)
Category
Construction
PIN
124446
Location
Virginia
Posted
Jul 15, 2026
Takeaways by LightRFP AI
  • Solicitation for trail bridge replacement and stream stabilization at NVCC Manassas Campus of Northern Virginia Community College.
  • Issuing agency is Northern Virginia Community College.
  • Procurement method is Invitation for Bids (IFB).
  • Posted date is 2026-07-15, due date is 2026-08-17 at 2:00 PM.
  • Contact is Merlin Espinal, email maespinal@nvcc.edu, phone 703-425-5689.
  • Work location is NVCC Manassas Campus of Northern Virginia Community College.
  • Scope includes replacing pedestrian bridge, stream stabilization, grade control features, erosion control, and restoration.
  • No estimated cost, bonding, licensing, or participation goals are stated in the source.

AI-generated, verify all details against the official documents.

Description

The project is generally described as “replacing the existing pedestrian bridge and performing stream stabilization in thesurrounding channel in accordance with the plans. The work includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements.

Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accommodate pedestrian and maintenance access and will be coordinated with the stream restoration to ensure long-term stability and hydraulic performance.

Documents3
260-A9260-018 MA Trail Bridge Replacement & stream Stabilization - Full Bid Document.pdfPDF
260-A9260-018 MA Trail Bridge Replacement & stream Stabilization - Full Drawings.pdfPDF
260-A9260-018 MA Trail Bridge Replacement & Stream Stabilization - Notice of IFB.pdfPDF

Contact

Name
Merlin Espinal
Phone
703-425-5689
Address
NVCC Manassas Campus of Northern Virginia Community College
Full source recordfrom Virginia eVA
Id
IV124446
App
IV
Doccd
IFB
Agency
A280NVCC
Detail
Fields
Buyer
Merlin Espinal
Issued
7/15/26 2:21 PM
Status
Open
Closing
8/17/26 2:00 PM
Summary
The project is generally described as “replacing the existing pedestrian bridge and performing stream stabilization in the surrounding channel in accordance with the plans. The work includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements. Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accommodate pedestrian and maintenance access and will be coordinated with the stream restoration to ensure long-term stability and hydraulic performance.
Category
Construction
Issued By
Northern Virginia Community College
Time Left
24 days
Work Location
NVCC Manassas Campus of Northern Virginia Community College
Open Responses
See solicitation documents Public Opening information.
Opportunity Type
Invitation for Bids (IFB)
Pre Bid Conference
See solicitation documents for optional prebid/proposal conference/site visit.
Summary
The project is generally described as “replacing the existing pedestrian bridge and performing stream stabilization in the surrounding channel in accordance with the plans. The work includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements. Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accommodate pedestrian and maintenance access and will be coordinated with the stream restoration to ensure long-term stability and hydraulic performance.
Attachments
Attachment Details
Url
["https://procure.cgieva.com/page.aspx/en/fil/download_public/88FAF9C2-D69B-44B4-8DCA-8E613FD7E427","https://procure.cgieva.com/page.aspx/en/fil/download_public/0BFDC728-C0B9-481A-BD9B-8896268D94E4","https://procure.cgieva.com/page.aspx/en/fil/download_public/C0BB0DC4-0299-469E-A10D-214F50BA8B93"]
Link
["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/88FAF9C2-D69B-44B4-8DCA-8E613FD7E427\"\">260-A9260-018 MA Trail Bridge Replacement & stream Stabilization - Full Bid Document.pdf</a>","<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/0BFDC728-C0B9-481A-BD9B-8896268D94E4\"\">260-A9260-018 MA Trail Bridge Replacement & stream Stabilization - Full Drawings.pdf</a>","<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/C0BB0DC4-0299-469E-A10D-214F50BA8B93\"\">260-A9260-018 MA Trail Bridge Replacement & Stream Stabilization - Notice of IFB.pdf</a>"]
File Guid
["88FAF9C2-D69B-44B4-8DCA-8E613FD7E427","0BFDC728-C0B9-481A-BD9B-8896268D94E4","C0BB0DC4-0299-469E-A10D-214F50BA8B93"]
File Name
["260-A9260-018 MA Trail Bridge Replacement & stream Stabilization - Full Bid Document.pdf","260-A9260-018 MA Trail Bridge Replacement & stream Stabilization - Full Drawings.pdf","260-A9260-018 MA Trail Bridge Replacement & Stream Stabilization - Notice of IFB.pdf"]
File Size
["3194182","29011270","470695"]
@Xmlns:Xsi
"http://www.w3.org/2001/XMLSchema-instance"
Ctn Created
["7/15/26","7/15/26","7/15/26"]
Ctn Title En
["Full Bid Document","Full Drawings","Notice of IFB"]
Content Label
["RFx Document","RFx Document","RFx Document"]
Contact Name
Merlin Espinal
Contact Email
maespinal@nvcc.edu
Contact Phone
703-425-5689
Status
Open
Doctype
SO
Pubdate
Jul 15, 2026
Version
0
Workloc
NVCC Manassas Campus of Northern Virginia Community College
Category
Construction
Longdesc
The project is generally described as “replacing the existing pedestrian bridge and performing stream stabilization in thesurrounding channel in accordance with the plans. The work includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements. Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accommodate pedestrian and maintenance access and will be coordinated with the stream restoration to ensure long-term stability and hydraulic performance.
Version
1870806106852294700
Buyername
Merlin Espinal
Closedate
Aug 17, 2026
Doccddesc
Invitation for Bids (IFB)
Docdeptcd
A280NVCC
Shortdesc
260-A9260-018 Trail Bridge Replacement & Stream Stabilization
Agencyname
Northern Virginia Community College
Externalid
124446
Internalid
124446
Buyerdeptname
Detail Fetched
Yes
Lastupdatedate
Jul 15, 2026
Categoryshortdesc
Construction

Source: Virginia eVA (solicitation VA_EVA-IV124446), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting — always confirm requirements and deadlines with the issuing agency.