Light RFP
Commonwealth of VA · Bridgewater, VA

Riverwalk, Phase III

Due Jul 30, 2026·2 days left·General ConstructionView official posting ↗
Issuing agency
Town of Bridgewater
Method
Invitation for Bids (IFB)
Category
Highway Construction
PIN
123330
Location
Bridgewater, VA
Posted
Jul 24, 2026
Takeaways by LightRFP AI
  • The Town of Bridgewater is accepting bids for the Riverwalk, Phase III construction project.
  • The project extends Riverwalk east from Edgebriar Park to Hatcher Drive and includes installation of a permeable paver shared-use path.
  • The project is VDOT funded through a Transportation Alternatives grant.
  • Bids are due by July 30, 2026 at 4:00 PM.
  • The procurement method is Invitation for Bids (IFB).
  • The place of performance is Bridgewater, Virginia.
  • The contact for this solicitation is Alex Wilmer at 540-908-4212 or amwilmer@bridgewater.town.
  • An optional pre-bid conference or site visit is referenced in the solicitation documents.

AI-generated, verify all details against the official documents.

Description

The Town of Bridgewater is accepting bids for the construction of the Riverwalk, Phase III project, which will extend Riverwalk east from Edgebriar Park to Hatcher Drive and includes the installation of a permeable paver, shared-use path along a portion of Phase III. VDOT funded project through Transportation Alternatives grant.

Documents2
231927_Bridgewater_Riverwalk.pdfPDF
UPC 121208 Project Manual (Bid Materials) 06-29-2026.pdfPDF

Contact

Name
Alex Wilmer
Phone
540-908-4212
Address
Bridgewater, Virginia
Full source recordfrom Virginia eVA
Id
IV123330
App
IV
Doccd
IFB
Agency
L052BRIDGEWATER
Detail
Fields
Buyer
Alex Wilmer
Issued
6/29/26 11:20 AM
Status
Open
Closing
7/30/26 4:00 PM
Summary
The Town of Bridgewater is accepting bids for the construction of the Riverwalk, Phase III project, which will extend Riverwalk east from Edgebriar Park to Hatcher Drive and includes the installation of a permeable paver, shared-use path along a portion of Phase III. VDOT funded project through Transportation Alternatives grant.
Website
procurement.bridgewater.town
Category
Highway Construction
Issued By
Town of Bridgewater
Time Left
6 days, 23 hours
Work Location
Bridgewater, Virginia
Open Responses
See solicitation documents Public Opening information.
Opportunity Type
Invitation for Bids (IFB)
Pre Bid Conference
See solicitation documents for optional prebid/proposal conference/site visit.
Summary
The Town of Bridgewater is accepting bids for the construction of the Riverwalk, Phase III project, which will extend Riverwalk east from Edgebriar Park to Hatcher Drive and includes the installation of a permeable paver, shared-use path along a portion of Phase III. VDOT funded project through Transportation Alternatives grant.
Attachments
Attachment Details
Url
["https://procure.cgieva.com/page.aspx/en/fil/download_public/2666F8F4-4178-41E1-A7FF-1849358EE4A1","https://procure.cgieva.com/page.aspx/en/fil/download_public/9AA5ECF6-48A0-4B9B-94D8-F2CA8CE0BD2A"]
Link
["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/2666F8F4-4178-41E1-A7FF-1849358EE4A1\"\">231927_Bridgewater_Riverwalk.pdf</a>","<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/9AA5ECF6-48A0-4B9B-94D8-F2CA8CE0BD2A\"\">UPC 121208 Project Manual (Bid Materials) 06-29-2026.pdf</a>"]
File Guid
["2666F8F4-4178-41E1-A7FF-1849358EE4A1","9AA5ECF6-48A0-4B9B-94D8-F2CA8CE0BD2A"]
File Name
["231927_Bridgewater_Riverwalk.pdf","UPC 121208 Project Manual (Bid Materials) 06-29-2026.pdf"]
File Size
["12427157","3071203"]
@Xmlns:Xsi
"http://www.w3.org/2001/XMLSchema-instance"
Ctn Created
["6/29/26","6/29/26"]
Ctn Title En
["Plans","Bid Documents"]
Content Label
["RFx Document","RFx Document"]
Contact Name
Alex Wilmer
Contact Email
amwilmer@bridgewater.town
Contact Phone
540-908-4212
Status
Open
Doctype
SO
Pubdate
Jul 24, 2026
Version
1
Workloc
Bridgewater, Virginia
Category
Highway Construction
Longdesc
The Town of Bridgewater is accepting bids for the construction of the Riverwalk, Phase III project, which will extend Riverwalk east from Edgebriar Park to Hatcher Drive and includes the installation of a permeable paver, shared-use path along a portion of Phase III. VDOT funded project through Transportation Alternatives grant.
Version
1871601681753440300
Buyername
Alex Wilmer
Closedate
Jul 30, 2026
Doccddesc
Invitation for Bids (IFB)
Docdeptcd
L052BRIDGEWATER
Shortdesc
Riverwalk, Phase III
Agencyname
Town of Bridgewater
Externalid
123330
Internalid
123330
Buyerdeptname
Detail Fetched
Yes
Lastupdatedate
Jul 24, 2026
Categoryshortdesc
Construction-HWY

Source: Virginia eVA (solicitation VA_EVA-IV123330), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting — always confirm requirements and deadlines with the issuing agency.