The scope of this project is to provide all the labor, materials, tools and equipment necessary to construct the Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project, complete as described in the plans and specifications. The project generally includes the following: to remove sediment and debris in the vicinity of this pedestrian bridge, excavate sediment deposits within the main and tributary channels and in the overbank areas to protect the pedestrian bridge and existing trail from erosion hazards, install a concrete apron on the channel bottom and banks to protect the bridge abutments of the proposed bridge from erosion hazards, install riprap on the downstream side of the three existing culverts, and provide erosion protection along the Pack Creek channel in the area
Source: State of Utah (Bonfire) (solicitation UT_U3P-244768), retrieved via the Utah Bonfire procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →