Light RFP
State of Utah · Utah

DFCM Construction - Prequalified GENERAL Stage II - Utah National Guard - Camp Williams Building New Wash Rack - 26290480

Due Jul 31, 2026·2 days left·General ConstructionView official posting ↗
Issuing agency
Utah DFCM / State
Method
Request for Proposals
PIN
DA27003
Location
Utah
Posted
Jul 8, 2026
Takeaways by LightRFP AI
  • The Utah DFCM is requesting bids for the design and construction of a new covered vehicle wash rack facility for the Utah National Guard at Camp Williams.
  • Only contractors prequalified under a Stage I Prequalification and on the DFCM Prequalified Contractors list are eligible to bid.
  • The project includes a 74’ x 81’ two-bay building with pass-through and sediment bays, plus a 555 SF Pump House.
  • The construction cost estimate is $2,850,000.00.
  • The solicitation is a Stage II Invitation to Bid using a Request for Proposals method.
  • The due date for bids is 2026-07-31 (based on source metadata).
  • The contact person is Jonathan Butler, with email jonathan.d.butler21.nfg@army.mil.
  • Requirement: Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid.

AI-generated, verify all details against the official documents.

Description

Stage II Invitation to Bid
Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.

The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:

Project Description: This project involves the design and construction of a new covered vehicle wash rack facility for the Utah National Guard at Camp Williams, featuring a 74’ x 81’ (5,994 SF) two-bay building with two pass-through and sediment bays (two Stage 1 and one Stage 2), alongside a 15’ x 37’ (555 SF) Pump House. To support year-round operations and prevent winter icing, the bays will incorporate an in-slab or overhead heating system paired with a frost-free water delivery network. Additionally, the project requires comprehensive civil engineering design to navigate significant site grade changes and safely relocate congested existing utilities.

Construction Cost Estimate: $2,850,000.00

Documents10
1-DA27003-26290480 Solicitation-Wash Rack.pdfPDF
2-DA27003-26290480 Plans.pdfPDF
3-DA27003-26290480 Specifications.pdfPDF
4-DA27003-26290480 Structural-Calculations.pdfPDF
5-DA27003-26290480 Comcheck Report.pdfPDF
A-DFCM General Conditions August 2020-Clean rev 07122023.pdfPDF
B-Subcontractors List Form Instructions-7.1.2021.docxDOCX
C-DFCM Health Insurance Statement of Compliance Form_ Revised 7.28.25.docxDOCX
DA27003 - pub - DFCM Construction - Prequalified GENERAL Sta.zipZIP
_-DA27003-26290480 Mandatory Meeting Attendees.pdfPDF

Contact

Name
Jonathan Butler
Address
Utah DFCM / State
Full source recordfrom State of Utah (Bonfire)
Detail
Contact Name
Jonathan Butler
Date Open Raw
2026-07-07 21:00:00
Description
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: **Project Description:** This project involves the design and construction of a new covered vehicle wash rack facility for the Utah National Guard at Camp Williams, featuring a 74’ x 81’ (5,994 SF) two-bay building with two pass-through and sediment bays (two Stage 1 and one Stage 2), alongside a 15’ x 37’ (555 SF) Pump House. To support year-round operations and prevent winter icing, the bays will incorporate an in-slab or overhead heating system paired with a frost-free water delivery network. Additionally, the project requires comprehensive civil engineering design to navigate significant site grade changes and safely relocate congested existing utilities. **Construction Cost Estimate:** $2,850,000.00
Contact Email
jonathan.d.butler21.nfg@army.mil
Date Close
2026-07-28 21:00:00
Project ID
243575
Project Name
DFCM Construction - Prequalified GENERAL Stage II - Utah National Guard - Camp Williams Building New Wash Rack - 26290480
Reference ID
DA27003
Department ID
11722
Categorized By
llm
Project Status ID
2
Private Project ID
77bf6431f02c20b962f7c534051983c0
Project Sub Status ID
1
Project Visibility ID
1

Source: State of Utah (Bonfire) (solicitation UT_U3P-243575), retrieved via the Utah Bonfire procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.