RHS Stage Lighting Electrical Support
The selected contractor shall provide all labor, tools, materials, equipment, supervision, and incidental work necessary to complete the electrical support. The scope includes: remove the existing dimming panel and install the new dimming/Sensor Rack panel in the designated electrical closet; pull individual neutral conductors from the stage electrical panel to the electrical closet panel location; install new conduit as required; remove the existing lighting control panel device and replace it with a new touchscreen station; remove existing button control devices and replace them with new button stations; install all equipment identified on the Sensor Rack Bill of Materials; pull new Cat5e cable from the controller to each touchscreen station; complete all electrical, control, and low-voltage terminations; remove existing equipment and legally dispose of removed materials and project debris; test contractor-installed wiring, devices, and terminations for proper electrical continuity and installation, and coordinate turnover with the stage lighting contractor and RAPS.
We post new electrical opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Michigan SIGMA VSS (solicitation RFP-ROSC-260000002582-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.