We post new general contractors opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
472/26360.KMM; Green Oaks TC - Equip Storage Bldg
The selected professional services contractor will provide design and construction administration services for a facility equipment storage building at the Green Oaks Training Center. The scope includes Phase 300 (Schematic Design), Phase 400 (Preliminary Design), Phase 500 (Final Design), Phase 600 (Construction Administration - Office Services), and Phase 700 (Construction Administration - Field Services). The building will house a front end loader, two zero turn mowers, a Bobcat, a truck with salt spreader, and other materials, with a minimum of 4 to 6 overhead doors, 12' ceilings with 10' high doors, a concrete entrance slab, and a heated interior. A separated salt storage bay with hardened walls, non-heated, with a high ceiling and door is also required. The design shall include site survey, building location analysis, soil borings/geotechnical analysis, electrical circuit capacity review, and LARA review. The contractor will also participate in the construction bidding and selection process and provide construction administration services.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Michigan SIGMA VSS (solicitation RFP-171-260000002449-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting , always confirm requirements and deadlines with the issuing agency.