Takeaways by LightRFP AI
  • SEPTA is soliciting technical proposals for the Traction Power Substation Rehabilitation Program – Contract 5 covering Broad, Loudon, Park, and Castor Substations in Philadelphia, PA.
  • The procurement uses a Two (2) Step Process: Step One is pre-qualification via technical proposals, and Step Two is a sealed bid process for pre-qualified firms.
  • Questions must be submitted in writing to jbenante@septa.org no later than 12:00 PM on Wednesday, June 24, 2026.
  • Technical proposals are due no later than 11:00 AM on Wednesday, July 15, 2026.
  • The work must be completed within 2,035 calendar days from the date of receipt of SEPTA's Notice to Proceed.
  • Requirement: Each complete bid must be accompanied by a Bid Bond, Cashier's Check, Certified Check, Treasurer's Check, and/or Official Bank Check in an amount of not less than FIVE PERCENT (5%) of the Amount Bid.
  • Requirement: If awarded the Contract, the Bidder must furnish within ten (10) days after receipt from SEPTA of a notice to award, a properly executed Performance Bond and Labor and Material Payment Bonds in the amount of 100 percent.
  • Requirement: The Contractor shall furnish and maintain properly executed Performance Bonds and Labor and Material Payment Bonds, each written by good and sufficient sureties and in form acceptable to SEPTA, each in the amount of one hundred percent (100%) of the Contract Sum.
  • Requirement: The Contractor shall, prior to final acceptance by SEPTA, furnish separate Maintenance (or Guarantee) Bonds in form acceptable to SEPTA written by the same corporate surety that provides the Performance Bond and Labor and Material Payment Bond for the Contract, securing the Contractor's obligation to replace or repair defective materials and faulty workmanship for a minimum period of one (1) year after final acceptance, in an amount equal to one hundred percent (100%) of the Contract Sum.

AI-generated, verify all details against the official documents.

Description

SEPTA will accept Proposals in SEPTA’s General Offices, 1234 Market Street, 11th Fl., Philadelphia, PA 19107 for the Proposal indicated.

This listing has limited details available. Please refer to the official posting for full scope, bonding requirements, submission instructions, and other bid details.

Documents37
Invitation to Propose - 2 Step Process - Traction Substation (PDF)PDF
Feder Construction Contract Step 2 - Contract 5 Substations (PDF)PDF
Attachment 3 - Form 330 (PDF)PDF
Substation Rehab Contract 5 - Step 1 (PDF)PDF
Attachment 4 - Addendum Acknowledgement (PDF)PDF
Document 6PDF
Document 7PDF
Document 8PDF
Document 9PDF
Addendum 1 - Contract 5 Substations - Step 1 (PDF)PDF
Addendum 2 - Contract Substations - Step 1 (PDF)PDF
22x34 Broad Street Contract 5 - Drawings Addendum 3 (PDF)PDF
22x34 Castor Contract 5 Drawings - Addendum 3 (PDF)PDF
22x34 General Notes Contract 5 Drawings - Addendum 3 (PDF)PDF
22x34 Loudon Contract 5 Drawings - Addendum 3 (PDF)PDF
22x34 Park Contract 5 Drawings - Addendum 3 (PDF)PDF
Addendum 3 - Contract 5 Substations - Step 1 -6-10-26 (PDF)PDF
Addendum 4 - Contract 5 Substations Step 1 6-15-26 (PDF)PDF
Site Visit Attendance Meeting Power Substation Contract 5 - 6-11-26 (PDF)PDF
Site Visit Attendance Meeting Substation Contract 5 - 6-12-26 (PDF)PDF
Pre-Qualification Meeting RFQ 26-00105-AJEB Substation attendance report 6-10-26 (PDF)PDF
Addendum - 5 Contract 5 Substations-Step 1 - 6-25-26 (PDF)PDF
3004 ACM Handling Program 2023 - Addendum 5 (PDF)PDF
Broad Peco Info - Addendum 5 (PDF)PDF
Document 25PDF
DWG 7E-16563 28 color a - Addendum 5 (PDF)PDF
Loudon WESS Details - REV3 Signed 171108 - Addendum 5 (PDF)PDF
Management of Lead Paint in SEPTA Construction Projects Document #3001 - Addendum 5 (PDF)PDF
Managing Asbestos In Place - Addendum 5 (PDF)PDF
Market PECO fault duty letters - dc TPSS - Addendum 5 (PDF)PDF
Orange-Blue-Green line emerg. lght single line diag. - Addendum 5 (PDF)PDF
Park Peco Info - Addendum (PDF)PDF
PECO fault duty letters - dc TPSS - Addendum 5 (PDF)PDF
SEPTA Environmental Report combined - Addendum 5 (PDF)PDF
SEPTA Station 20 Sansom Points List - Addendum 5 (PDF)PDF
Tentative Layour of WESS Equipment in Park TPSS 22 Jan-2018 - Addendum 5 (PDF)PDF
Addendum 6 - Contract 5 Substations-Step 1--7-6-26 (PDF)PDF

Contact

Name
Justin Benante
Phone
215-580-7022
Address
Philadelphia, PA
Full source recordfrom SEPTA
Detail
Bid Id
RFP 26-00105-AJEB
Category
ePS Bids/RFPs
Documents
https://wwww.septa.org/wp-content/uploads/bid/JAL192590415-Invitation-to-Propose-2-Step-Process-Traction-Substation.pdf?fn=Invitation%20to%20Propose%20-%202%20Step%20Process%20-%20Traction%20Substation%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Exhibit-FEDERAL-CONSTRUCTION-CONTRACT-STEP-2-CONTRACT-5-SUBSTATIONS.pdf?fn=Feder%20Construction%20Contract%20Step%202%20-%20Contract%205%20Substations%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/ATTACHMENT-3-Form-330.pdf?fn=Attachment%203%20-%20Form%20330%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/JAL192590415-Substation-Rehab-Contract-5-Step-1.pdf?fn=Substation%20Rehab%20Contract%205%20-%20Step%201%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/ATTACHMENT-4-Addendum-Acknowledgement-1.pdf?fn=Attachment%204%20-%20Addendum%20Acknowledgement%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/ATTACHMENT-1-SEPTA-Contract-5-Substations-50-Specifications.pdf?fn=Attachment%201%20-%20SEPTA%20Contract%205%20Substations%2050%25%20Specifications%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-1.pdf?fn=Attachment%202%20-%20SEPTA%20Contract%205%20Market%2050%25%20Broad%2C%20Park%2C%20Loudon%2C%20Castor%20-%20Drawings%20SET%201%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-2.pdf?fn=Attachment%202%20-%20SEPTA%20Contract%205%20Market%2050%25%20Broad%2C%20Park%2C%20Loudon%2C%20Castor%20-%20Drawings%20SET%202%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-3.pdf?fn=Attachment%202%20-%20SEPTA%20Contract%205%20Market%2050%25%20Broad%2C%20Park%2C%20Loudon%2C%20Castor%20-%20Drawings%20SET%203%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Addendum-1-Contract-5-Substations-Step-1-6-3-26.pdf?fn=Addendum%201%20-%20Contract%205%20Substations%20-%20Step%201%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Addendum-2-Contract-5-Substations-Step-1-6-4-26.pdf?fn=Addendum%202%20-%20Contract%20Substations%20-%20Step%201%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/22x34-Broad-Street-Contract-5-Drawings-Addendum-3.pdf?fn=22x34%20Broad%20Street%20Contract%205%20-%20Drawings%20Addendum%203%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/22x34-Castor-Contract-5-Drawings-Addendum-3.pdf?fn=22x34%20Castor%20Contract%205%20Drawings%20-%20Addendum%203%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/22x34-General-Notes-Contract-5-Drawings-Addendum-3.pdf?fn=22x34%20General%20Notes%20Contract%205%20Drawings%20-%20Addendum%203%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/22x34-Loudon-Contract-5-Drawings-Addendum-3.pdf?fn=22x34%20Loudon%20Contract%205%20Drawings%20-%20Addendum%203%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/22x34-Park-Contract-5-Drawings-Addendum-3.pdf?fn=22x34%20Park%20Contract%205%20Drawings%20-%20Addendum%203%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Addendum-3-Contract-5-Substations-Step-1-6-10-26.pdf?fn=Addendum%203%20-%20Contract%205%20Substations%20-%20Step%201%20-6-10-26%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Addendum-4-Contract-5-Substations-Step-1-6-15-26.pdf?fn=Addendum%204%20-%20Contract%205%20Substations%20Step%201%206-15-26%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/SIte-Visit-Attendance-Meeting-Power-Substation-Contract-5-6-11-26.pdf?fn=Site%20Visit%20Attendance%20Meeting%20Power%20Substation%20Contract%205%20-%206-11-26%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Site-Visit-Attendance-Meeting-Substation-Contract-5-6-12-26.pdf?fn=Site%20Visit%20Attendance%20Meeting%20Substation%20Contract%205%20-%206-12-26%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Pre-Qualification-Meeting_-RFQ_-26-00105-AJEB-Substation-attendance-report-6-10-26.pdf?fn=Pre-Qualification%20Meeting%20RFQ%2026-00105-AJEB%20Substation%20attendance%20report%206-10-26%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Addendum-5-Contract-5-Substations-Step-1-6-25-26.pdf?fn=Addendum%20-%205%20Contract%205%20Substations-Step%201%20-%206-25-26%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/3004-ACM-Handling-Program-2023-Addendum-5.pdf?fn=3004%20ACM%20Handling%20Program%202023%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Broad-Peco-Info-Addendum-5.pdf?fn=Broad%20Peco%20Info%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Broad-Roof-Replacement-100-DWG_Set-Addendum-5.pdf?fn=Broad%20Roof%20Replacement%20100%25%20DWG%20Set%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/DWG-7E-16563_28_color_a-Addendum-5.pdf?fn=DWG%207E-16563%2028%20color%20a%20-%20Addendum%205%20%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Loudon-WESS-Details-REV3_signed-171108-Addendum-5.pdf?fn=Loudon%20WESS%20Details%20-%20REV3%20Signed%20171108%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Management-of-Lead-Paint-in-SEPTA-Construction-Projects-Document-3001-Addendum-5.pdf?fn=Management%20of%20Lead%20Paint%20in%20SEPTA%20Construction%20Projects%20Document%20%233001%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Managing-Asbestos-In-Place-Addendum-5.pdf?fn=Managing%20Asbestos%20In%20Place%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Market-PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf?fn=Market%20PECO%20fault%20duty%20letters%20-%20dc%20TPSS%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Orange-Blue-Green-line-emerg.-lght-single-line-diag.-Addendum-5.pdf?fn=Orange-Blue-Green%20line%20emerg.%20lght%20single%20line%20diag.%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Park-Peco-Info-Addendum-5.pdf?fn=Park%20Peco%20Info%20-%20Addendum%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf?fn=PECO%20fault%20duty%20letters%20-%20dc%20TPSS%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/SEPTA-Environmental-Report-combined-Addendum-5.pdf?fn=SEPTA%20Environmental%20Report%20combined%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/SEPTA-Station-20-Sansom-Points-List-Addendum-5.pdf?fn=SEPTA%20Station%2020%20Sansom%20Points%20List%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Tentative-Layout-of-WESS-Equipment-in-Park-TPSS_22-Jan-2018-Addendum-5.pdf?fn=Tentative%20Layour%20of%20WESS%20Equipment%20in%20Park%20TPSS%2022%20Jan-2018%20-%20Addendum%205%20(PDF), https://wwww.septa.org/wp-content/uploads/bid/Addendum-6-Contract-5-Substations-Step-1-7-6-26.pdf?fn=Addendum%206%20-%20Contract%205%20Substations-Step%201--7-6-26%20(PDF)
Contact Name
Justin Benante
Description
SEPTA will accept Proposals in SEPTA’s General Offices, 1234 Market Street, 11th Fl., Philadelphia, PA 19107 for the Proposal indicated.
Contact Email
jbenante@septa.org
Contact Phone
215-580-7022
Listing
Pin
RFP 26-00105-AJEB
Slug
traction-power-substation-rehabilitation-program-contract-5-broad-loudon-park-and-castor-substations-project
Title
Traction Power Substation Rehabilitation Program – Contract 5 Broad, Loudon, Park and Castor Substations Project
Cat Review
At
Jul 17, 2026
Method
openrouter
Taxonomy
construction
Categorized By
llm
Detail Fetched
Yes

Source: SEPTA (solicitation SEPTA-26-00105-AJEB), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.