Light RFP
Government · Newberry, SC

Industrial Park Pump Station Replacement

Due Aug 25, 2026·28 days left·Electrical, Plumbing, Demolition / Abatement, ElevatorView official posting ↗
Issuing agency
City of Newberry
Method
Design-Bid-Build
Category
Construction
PIN
KCI Project No. 00051564_001
Location
Newberry, SC
Posted
Jul 16, 2026
Takeaways by LightRFP AI
  • The City of Newberry is soliciting sealed bids for the Industrial Park Pump Station Replacement project in Newberry, SC.
  • The project includes a new pre-cast concrete wetwell, duplex suction lift pumps, a control building, a diesel bypass pump, a dual auger screen, approximately 254 LF of 12-inch gravity sewer, and approximately 133 LF of 12-inch forcemain.
  • Sealed bids are due by 2:00 PM local time on August 25, 2026, and will be publicly opened and read at that time.
  • A pre-bid conference will be held at 10:00 AM on August 6, 2026, at the pump station site.
  • Questions regarding the bid must be submitted before 5:00 PM on August 14, 2026.
  • The estimated construction cost range is $1,750,000.
  • Bidding documents are available for a non-refundable charge of $22.00 via QuestCDN.
  • Requirement: Bidders must deposit security with all bids in the form of a certified check or bid bond for an amount equal to not less than five percent (5%) of the amount of the bid.
  • Requirement: Performance and Payment Bonds, each in the amount of 100% of the contract price, will be required of the successful bidder.
  • Requirement: Contractors shall have a classification of WL or WP under the South Carolina Contractor's Licensing Law.

AI-generated, verify all details against the official documents.

Description

The project consists of the installation of a new pump station to replace the existing Industrial Park Pump Station. The work includes a new pre-cast concrete wetwell, duplex suction lift pumps / controls, a new control building, a diesel bypass pump, a dual auger screen, approximately 254 LF of 12-inch gravity sewer, approximately 133 LF of 12-inch forcemain, electrical work, site grading, demolition of the existing pump station, and associated work tasks.

Delivery Method: Design-Bid-Build

Construction Cost Range: $1,750,000

Documents: www.questcdn.com

Documents1
industrial_park_pump_station_replacement.phpPHP

Contact

Name
KCI Technologies, Inc.
Phone
(864) 269-0890
Address
Newberry, SC
Full source recordfrom City of Newberry
Ad
Email
kara.hrkach@kci.com
Links
mailto:kara.hrkach@kci.com, https://www.cityofnewberry.com/bid_solicitations/industrial_park_pump_station_replacement.php, https://scbo.sc.gov/printad?a=67399
Docs From
www.questcdn.com
Bid Copies
1
Cost Range
$1,750,000
Telephone
(864) 269-0890
Agency Owner
City of Newberry
Bid Date Time
August 25, 2026 - 2:00pm
Coordinator
KCI Technologies, Inc.
Description
The project consists of the installation of a new pump station to replace the existing Industrial Park Pump Station. The work includes a new pre-cast concrete wetwell, duplex suction lift pumps / controls, a new control building, a diesel bypass pump, a dual auger screen, approximately 254 LF of 12-inch gravity sewer, approximately 133 LF of 12-inch forcemain, electrical work, site grading, demolition of the existing pump station, and associated work tasks.
Project Name
Industrial Park Pump Station Replacement
Category Code
3
Category Name
Construction
Ad Publish Date
July 16, 2026
Project Number
KCI Project No. 00051564_001
Delivery Method
Design-Bid-Build
Project Location
Newberry, SC
Detail Fetched
No