This project consists of a pre-engineered metal building with a concrete masonry unit (CMU) base, metal wall panels, and a steel-grate mezzanine. The scope includes steel-grate stairs, an overhead crane, exhaust fans, extending the campus medium voltage power to the building, power distribution for welding stations, and lighting systems. Site work includes clearing, grading, and construction of a stormwater retention pond.
Delivery Method: Design-Bid-Build
Construction Cost Range: $1,700,000 to $2,100,000
Documents: https://www.midlandstech.edu/procurement/construction-projects
Source: Midlands Technical College (solicitation SC_SCBO-H59-N348-AT), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →