SC State UniversityIssuing agency·South Carolina·via a public procurement portal
18days left
Due Sep 10, 2026·Posted Aug 14, 2026
AI takeaways
The project is anticipated to be delivered via Design-Bid-Build, with an estimated construction cost range of $6,000,000 to $7,000,000.
Resumes are due by September 10, 2026 at 2:00 PM, with the solicitation posted on August 14, 2026.
The selected firm will provide full AE services for Phase I and II design through construction and bid documents, including contract administration and close out.
Interested firms must submit a Standard Federal Form 330, primary contact information, a South Carolina residency certification, and a response to selection criteria per SC Code § 11-35-3220.
Firms must be properly licensed in accordance with Title 40 of the SC Code of Laws at the time of resume submission.
Requirement: Firms must be properly licensed in accordance with the requirements of Title 40 of the SC Code of Laws.
Licence
properly licensed in accordance with the…
Est. value
$6,000,000 to…
Method
Design-Bid-Build
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Provide the name and contact information, including email, of a primary contact.
Submit a certification stating whether the firm is a resident of South Carolina.
Provide a response to the selection criteria set forth in SC Code § 11-35-3220.
Requirements
From the documents
Licence
properly licensed in accordance with the requirements of Title 40 of the SC Code of Laws
Estimated value
$6,000,000 to $7,000,000
Posted Scope of Work
Design a new state of the art Public Safety Building to meet the needs of a growing University campus. This will be a 2 story structure approximately 10 to 12,000 sq ft. Meeting and training spaces with administrative offices and a detention room. The new building will also house the University emergency response center.
Delivery Method: Design-Bid-Build
More architecture and design bids in South Carolina, weekly.
We post new architecture and design opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The resume deadline is September 10, 2026 at 2:00 PM.
What is the estimated construction cost range?
The anticipated construction cost range is $6,000,000 to $7,000,000.
What delivery method is anticipated for this project?
The anticipated project delivery method is Design-Bid-Build.
What items must interested firms submit?
Interested firms should submit a current Standard Federal Form 330, the name and contact information of a primary contact, a certification stating whether the firm is a resident of South Carolina, and a response to selection criteria set forth in SC Code § 11-35-3220.
Full source recordEvery field SC State University published, untouched
Design a new state of the art Public Safety Building to meet the needs of a growing University campus. This will be a 2 story structure approximately 10 to 12,000 sq ft. Meeting and training spaces with administrative offices and a detention room. The new building will also house the University emergency response center.
Surety · through Light RFPbid bond free · p&p flat 3%
Need a bond for this one? The bid bond is free.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: SC State University (solicitation H24-T014-LC), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.