Install 13,578 LF 12-inch C900 Force Main installed by open cut method. 180 LF 12-inch DIP Main installed by open cut method. 300 LF of 14-inch HDPE installed by horizontal dire drill. 10 air release valves, connecting to existing pump station number 2 an apurtenances. Registration with Duncan Parnell is required to obtain the bid documents and be added to the official Plan Holder’s List.
Delivery Method: Design-Bid-Build