Existing air handling units (AHUs), AHU-2F and AHU-3F, are to be replaced with new AHUs, including modifications to piping, extension of electrical feeds, and connection to the existing campus building control system.
Delivery Method: Design-Bid-Build
Construction Cost Range: $150,000 to $165,000 Prime Contractor License (Special Standard of Responsibility): AC or PK