This project is to replace piping with 36" RCP and pavement along 2nd Street. This project includes corrective measures to address nuisance flooding thru grading and installation of a drainage system to drain the low-lying areas. A non-mandatory pre-bid and conference call will be at 10 am, September 4, 2026 via a virtual conference call.
Delivery Method: Design-Bid-Build
Documents: Don Alexander,(803)606-8092,Dalexander@parrishandpartners.com
The project involves replacing piping with 36" RCP and pavement along 2nd Street, and includes corrective measures to address nuisance flooding through grading and installation of a drainage system to drain low-lying areas.
We post new excavating opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Bamberg County (solicitation 24180-0005), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.