Construction of the new water main. Phase 1 consists of construction of approximately 8,880-linear feet of ten-inch water main, 20-linear feet of six-inch water main, twelve fire hydrant assemblies, and all connections, installation, and associated work. Phase 2 consists of construction of approximately1,935-linear feet of ten-inch water main approximately 45-linear feet of six (6)-inch water main, and one (1) fire hydrant assembly, and all connections, installation, and associated work.
Delivery Method: Design-Bid-Build