We are looking to get pricing for Demolition, Abatement, Concrete, Masonry, Structural Steel, Misc. Metal, Roofing, Drywall, Flooring, Painting, Fire Protection, Plumbing, Mechanical, Electrical, Sitework and Overhead Crane scope.
Place of Performance: Connecticut
The scope consists of construction of 6 Containerized Long Weapons Storage (CLWS), 2 Box G, and 1 Box H earth-covered, high-explosive magazines including overhead cranes, and incidental related work. Magazine construction will consist of foundations, walls, reinforced concrete floors, entrance and loading aprons, grounding and lightning protection systems; intrusion detection systems (IDS) and earth-covering. Site preparations include clearing, rock excavation, grading and fill. Construction will impact existing wetlands and requires mitigation. Work also includes construction of new Ordnance Operations building, Truck Inspection, Sentry building, and demolition of 18 existing magazines, building 524, and building 393. Special foundation features include rigid inclusions and load transfer mats at the magazine locations on the site. Paving and site improvements include access roads, paved truck loading/unloading areas, and landscaping. Electrical utilities include primary and secondary distribution systems, outside lighting, transformers, and telecommunications infrastructure.
We post new general contractors opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: J & J Contractors, Inc (SUBNet), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.