PARK: Elia Park
PW 10242
Closing Date: 07/30/2026 11:00:00 AM PT
Detail:
Public Works Department CIP Procurement
(408) 535-8300 / PW_Procurement@sanjoseca.gov
NOTICE IS HEREBY GIVEN that the City of San José (“City”) seeks sealed bid proposals in accordance
with the following.
Project Name**:** 10242 – PARK: Elia Park (“Project”)
Description of Work: The Project generally involves construction of a 0.33-acre public park located at the southwest corner of Alma Avenue and Sanborn Ave. The scope of work generally includes demolition, clearing and grubbing, earthwork and grading, soil remediation, erosion control, storm drainage improvements, concrete sidewalks, permeable pavers, walls and fencing, playground construction and safety surfacing, shade structure, site lighting, irrigation, landscaping, site furnishings, and signage.
Engineer’s Estimate: $3,205,000.00
All proposals must be delivered to the City via Biddingo (www.biddingo.com/sanjose),) on or before 11:00 a.m. on Thursday, July 23, 2026. Bidders are responsible for ensuring that their bid is submitted prior to the deadline specified above. To download documents and start your submission go to Bid Documents / Online Submission. For technical support, please contact Biddingo directly at 1-416-756-0955 or 1-800-208-1290 or via email at ebidding@biddingo.com.
A representative of the Director of Public Works will publicly open and declare the aggregate bid of each bidder, using the Zoom virtual meeting platform, shortly after the filing deadline. Interested parties can access the virtual bid opening by visiting https://www.sanjoseca.gov/CIPBids.
The City is using Biddingo, an online bid solicitation website, to facilitate this procurement. This procurement is registered on Biddingo (https://www.biddingo.com/sanjose) under the bid number and bid name above and has the following commodity code classifications(s):
100000 - Abatement Services- Including All Hazardous Material 017500 - Concrete
100301 - Construction- Backfill. Digging, Ditching, Grading, Rock Stabilization, Etc. 100307 - Construction- Recreational Facilities (Includes Parks. Athletic Facilities, Trails) 023000 - Earthwork and Paving Equipment
043525 - Irrigation
043400 - Landscaping
057500 - Park and Playground Equipment 071500 - Sewer and Storm Drain
All documents and information related to this procurement, including the Project plans and specifications, are on the Biddingo website under the bid number and bid name above. Once registered, bidders can view and download information regarding this procurement, including the bid and contract documents, as well as submit questions related to the bid and contract documents.
Once a bidder views or downloads documents for this bid, the bidder becomes a “document taker.” Biddingo will send “document takers” a notification every time the City posts an addendum, responds to a question and/or provides new information related to this procurement. Each bidder is responsible for selecting the appropriate notification options related to its Biddingo account. Following review by the City, proposals will be uploaded to Biddingo.
Bidders must periodically check Biddingo to make sure the bidder has the most recent information about this procurement.
Bidders must submit questions or requests for information concerning any part of this bid in writing to the City via Biddingo. The City will not respond to any communication or question submitted directly to City staff or City consultants. Submit questions via Biddingo no later than Thursday, July 16, 2026 at 11:00 am.
All bidders are expected to have read and understand the "Procurement and Contract Process Integrity and Conflict of Interest," Section 7 of the Consolidated Open Government and Ethics Provisions adopted on April 9, 2024, a complete copy of which can be found at https://records.sanjoseca.gov/Resolutions/RES2024-99.pdf.
Any bidder who violates this policy will be subject to disqualification. The grounds for disqualification include contact regarding this procurement with any City official or employee or evaluation team member other than the Procurement Contact or Purchasing Officer from the time of issuance of this solicitation until the end of the protest period.
Bidders can only rely on information obtained through Biddingo. Bidders can not rely on any other written or oral statements of the City or its officers, directors, employees or agents regarding this procurement. In the event a bidder obtains information about this procurement through any means other than Biddingo, the City will not be responsible for the completeness, accuracy or timeliness of the final bid proposal.
A non-mandatory site visit will be held on Thursday, July 9, 2026 at 11:00 AMat 100 W Alma Ave, San Jose, CA 95110. This site visit will be held to allow potential bidders to view the project location. No questions will be answered at this meeting.
All prospective bidders are hereby cautioned that the Contractor’s State License Law regulates contractor licensing matters. The Contractor, in its bid proposal, shall be required to disclose its license type, number, and expiration date.
Bidders must have a valid California contractor’s license, classification A to bid this project.
Bidder and all designated subcontractors must be registered with the Department of Industrial Relations in accordance with California Labor Code Sections 1725.5 and 1771.1. The City will not accept a bid in which the bidder or any of the designated subcontractors are not registered in accordance with Sections 1725.5 and 1771.1.
See Section 2-1.17 of the Special Provisions for the “registration” requirements applicable to the contract.
This project is a “public works” as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled “Prevailing Wage Requirements for City Contracts Involving Public Works,” the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City’s Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work.
See Section 7-1.01a(3) of the Special Provisions for the prevailing wage requirements applicable to the contract. Copies of the prevailing rate of per diem wages and the general prevailing wage rates for holiday and overtime work in effect for this project are on file and available for your review from the City’s Office of Equality Assurance at 408-535-8430.
Bidders are expected to have read and understand the “Wage Theft Prevention Policy” adopted on April 11, 2023. A complete copy of Resolution No. RES 2023-96 can be found at https://www.sanjoseca.gov/home/showpublisheddocument/96686/638176810489930000.
Any Bidder in violation of the City’s “Wage Theft Prevention Policy” will be disqualified.
This project is subject to the Project Labor Agreement (“PLA”) entered between the City of San José and the Santa Clara and San Benito Counties Building & Construction Trades Council, as may be amended from time to time. The awarded Bidder will be required to agree to the terms of the agreement by signing Addendum A – Agreement to be Bound, of the PLA agreement, and submit at the time the contract is executed.
See Attachment 6 for a copy of the PLA including Addendum A.
The Nondiscrimination/Nonpreferential Treatment requirements of Chapter 4.08 of the San Jose Municipal Code apply to this project.
Each bid must be accompanied by an electronic pdf copy of a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Bonds must be issued by a surety that is an “admitted surety insurer” in the State of California and must name the City of San José as beneficiary. Bonds must be accompanied by an electronic pdf copy of the surety’s power of attorney and a notary acknowledgement for the surety’s signature. Bidders must retain the original wet-signed bidder’s bond and provide it to the City upon request.
This project is subject to the California Air Resources Board (CARB) In-Use Off-Road Diesel-Fueled Fleets requirements found in California Code of Regulations, Title 13, Div. 3, Ch. 9, Art. 4.8, Sec. 2449 (“CARB Off-Road Regulations”). Bidders must submit valid Certificate(s) of Reported Compliance for itself and all designated subcontractor(s) that are using fleet(s) subject to the CARB Off-Road Regulations in performance of this contract.
Certificates of Reported Compliance are obtained through CARB’s Diesel Off-Road Online Reporting System (DOORS). For technical support, please contact CARB directly at 1-877-593-6677 or via email at doors@arb.ca.gov.
Each bidder is responsible for determining whether its participation in this procurement constitutes a conflict of interest or a potential conflict of interest under California Government Code Sections 1090 or 83111-83116, or other applicable law. Potential conflicts of interest include, but are not limited to, situations in which the bidder participated in developing or drafting specifications, requirements, statements of work, or invitations to bid.
The existence of such a conflict of interest is a basis for the City to disqualify a bidder from participation in this procurement process. If the City determines that a bidder is disqualified because of the existence of such a conflict of interest, it will provide the bidder with a written statement of the facts leading to that conclusion.
Bidder’s attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor’s Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San José. Bonds must be issued by a surety that is an “admitted surety insurer” in the State of California possessing a power of attorney and shall name the City of San José as beneficiary. The Contractor’s Faithful Performance Bond shall be for 100% of the contract amount. The Contractor’s Payment Bond shall be for 100% of the contract amount.
Pursuant to the terms and conditions set forth in Public Contracts Code Section 22300, the contractor may substitute certain securities for any money withheld by City as retention to ensure contractor’s performance under the contract. Such substitution of securities in lieu of retention shall be at the contractor’s request and at contractor’s sole expense. The securities shall be in an amount equivalent to the retention to be released.
{"type":null,"fileId":1000001,"itemId":null,"postId":null,"fileName":"10242-Elia Park pre-bid site visit_attendance sheet.pdf","filePath":null,"fileSize":"432KB","isDeleted":null,"addendumId":1000001,"pageNumber":1,"revisionId":null,"description":"PW 10242 Site Visit Sign-In Sheet ","ndaRequired":null,"updatedDate":"07/09/2026","addendumName":null,"contentSeqId":null,"isReattached":null,"biddingoSeqId":null,"docContentsId":null,"addendumNumber":null,"downloadedDate":null,"downloadedUser":null,"encodedFileName":"494da1957b87929470e52c0a68d8e20b","priceForShipping":null,"priceForBluePrint":null,"isMandatoryReattach":null,"previewEncodedFileName":null}Source: City of San José - Public Works (solicitation SAN_JOSE_BIDDINGO-576179), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →