Light RFP
Government · Guilford, PA

(HIGHWAY RECONSTRUCTION) - Franklin County

Due Sep 3, 2026·36 days left·General ConstructionView official posting ↗
Issuing agency
Pennsylvania Department of Transportation (PennDOT)
Method
Invitation for Bids (IFB)
Category
HIGHWAY RECONSTRUCTION
PIN
ECMS-93055
Location
Guilford, PA
Posted
Jul 17, 2026
Takeaways by LightRFP AI
  • PennDOT is soliciting bids for the SR 0081-075 Guilford Springs Road Interchange (Exit 12) highway reconstruction project in Guilford Township, Franklin County, PA.
  • The project includes constructing a full-access interchange, four new ramps, a new structure over I-81, stormwater management, traffic signal upgrades, drainage improvements, and milling/overlaying roadways.
  • The overall project length is 5,400.00 linear feet (1.023 mile).
  • The estimated cost range is $35,000,000.00 to $39,999,999.99.
  • Bids are due by 11:00 AM on September 3, 2026, with a public bid opening at the Commonwealth Keystone Building in Harrisburg.
  • The anticipated notice to proceed (NTP) is October 19, 2026, and the required completion date is December 30, 2030.
  • There is no pre-bid meeting scheduled.
  • Requirement: Prequalification is required ("prequalification":"Yes").
  • Requirement: Prevailing wage rates apply ("wageRates":"Yes").
  • Requirement: DBE participation goal is 0% ("dbePct":"0%").
  • Requirement: Structural work is 9.00% of the contract ("structWorkDetail":"9.00%").

AI-generated, verify all details against the official documents.

Description

The SR 0081-075 Guilford Springs Road Interchange (Exit 12) project consists of constructing a full-access interchange to serve SR 2038/T-467 (Guilford Springs Road) along with four (4) new interchange ramps, new SR 2038 Structure over I-81, Stormwater management features, traffic signal upgrades, drainage improvements, milling and overlaying the existing roadways, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0081, SECTION 075, in FRANKLIN COUNTY, GUILFORD TOWNSHIP, from south of Guilford Springs Road at Segment 0114/0115 Offset 2378/2425 to north of Guilford Springs Road at Segment 0130/0131 Offset 0059/0056, for an overall project length of 5,400.00 linear feet (1.023 mile).

Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

Contact

Address
GUILFORD, Franklin County, PA
Full source recordfrom Pennsylvania Department of Transportation (PennDOT)
Detail
Dbe Pct
0%
Status
Published Bid Results
Let Type
Scheduled
Org Code
0800
Wage Rates
Yes
Description
The SR 0081-075 Guilford Springs Road Interchange (Exit 12) project consists of constructing a full-access interchange to serve SR 2038/T-467 (Guilford Springs Road) along with four (4) new interchange ramps, new SR 2038 Structure over I-81, Stormwater management features, traffic signal upgrades, drainage improvements, milling and overlaying the existing roadways, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0081, SECTION 075, in FRANKLIN COUNTY, GUILFORD TOWNSHIP, from south of Guilford Springs Road at Segment 0114/0115 Offset 2378/2425 to north of Guilford Springs Road at Segment 0130/0131 Offset 0059/0056, for an overall project length of 5,400.00 linear feet (1.023 mile).
S408 Version
2026-IE
Municipality
GUILFORD
Let Date Detail
09/03/2026 11:00:00 AM
Pre Bid Meeting
None
Additional Info
This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Anticipated Ntp
10/19/2026
Cost Range Detail
$35,000,000.00 - $39,999,999.99 Federal Project Status:
State Type Of Work
HIGHWAY RECONSTRUCTION
Fed Project Status
Federal Oversight
Prequalification
Yes
Short Description
I-81 New Interchange (Exit 12)
Struct Work Detail
9.00%
Required Completion
12/30/2030
Listing
Type
Standard
County
Franklin
Group Id
---
Let Date
Sep 3, 2026
Section
075
District
08
Cost Range
35000-40000
Let Date Raw
09/03/2026 11:00 AM
State Route
81
Type Of Work
HIGHWAY RECONSTRUCTION
Bid Package Num
1
Struct Work Pct
9%
Ecms Project Num
93055
Bid Submitted Using
ECMS
Ecms Project Num Url
93,055
Detail Fetched
Yes

Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_93055_1), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.