Light RFP
Government · Carbon, PA

(BOX CULVERTS) - Huntingdon County

Due Aug 13, 2026·15 days left·Bridge / InfrastructureView official posting ↗
Issuing agency
Pennsylvania Department of Transportation (PennDOT)
Method
Invitation for Bids (IFB)
Category
BOX CULVERTS
PIN
ECMS-91441
Location
Carbon, PA
Posted
Jul 15, 2026
Takeaways by LightRFP AI
  • PennDOT is soliciting bids for a bridge replacement on PA 913 over Sugar Camp Run in Carbon Township, Huntingdon County.
  • The project is an Invitation for Bids (IFB) with a due date of August 13, 2026.
  • The estimated cost range is $500,000.00 - $999,999.99.
  • The required completion date is August 10, 2027.
  • The anticipated notice to proceed is September 28, 2026.
  • The public bid opening will be held at the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg.
  • Requirement: Prequalification is required (stated as 'prequalification': 'Yes').
  • Requirement: Prevailing wage rates apply (stated as 'wageRates': 'Yes').

AI-generated, verify all details against the official documents.

Description

This project is a Bridge replacement on PA 913 (Broad Top Mountain Road) over Sugar Camp Run near the intersection of T-402 (Risbon Road) in Carbon Township Huntingdon County as indicated on the approved drawings included in the bid package for STATE ROUTE 0913, SECTION 08B from approximately Segment 0040 Offset 2642 to Segment 0050 Offset 0306.

Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

Contact

Address
CARBON, Huntingdon County, PA
Full source recordfrom Pennsylvania Department of Transportation (PennDOT)
Detail
Status
Published Bid Results
Let Type
Scheduled
Org Code
0900
Wage Rates
Yes
Description
This project is a Bridge replacement on PA 913 (Broad Top Mountain Road) over Sugar Camp Run near the intersection of T-402 (Risbon Road) in Carbon Township Huntingdon County as indicated on the approved drawings included in the bid package for STATE ROUTE 0913, SECTION 08B from approximately Segment 0040 Offset 2642 to Segment 0050 Offset 0306.
S408 Version
2026-IE
Municipality
CARBON
Let Date Detail
08/13/2026 11:00:00 AM
Pre Bid Meeting
None
Additional Info
This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Anticipated Ntp
09/28/2026
Cost Range Detail
$500,000.00 - $999,999.99 Federal Project Status:
State Type Of Work
BOX CULVERTS
Fed Project Status
Non - Federal (100% State)
Prequalification
Yes
Short Description
PA 913 Sugar Camp Run
Struct Work Detail
63.00%
Required Completion
08/10/2027
Listing
Type
Standard
County
Huntingdon
Group Id
---
Let Date
Aug 13, 2026
Section
08B
District
09
Cost Range
500-1000
Let Date Raw
08/13/2026 11:00 AM
State Route
913
Type Of Work
BOX CULVERTS
Bid Package Num
1
Struct Work Pct
63%
Ecms Project Num
91441
Bid Submitted Using
ECMS
Ecms Project Num Url
91,441
Detail Fetched
Yes

Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_91441_1), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.